My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Civil Works Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(06-12-02) General Engineering Consultants
>
Responses
>
Civil Works Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:25:30 AM
Creation date
1/24/2011 4:25:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultants
Bid No. (xx-xx-xx)
06-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IGustavo Eckardt, E.I. Construction Administration - 2 <br />' Bermuda Village - Force Main - Performed daily observation of work progress during the installation of <br />6" force main from a new residential development to a city pump station. Project included MOT, <br />excavation, 2,700 ft of force main, rock bedding, flowable fill, asphalt patching, pressure test and <br />' connection to city lift station. <br />' Spanish Trace Condominium - Drainage Improvements and Parking Lot Resurfacing Project. <br />Observed construction operations and documented progress for the asphalt resurfacing and striping <br />of a parking lot for a residential condominium. Also performed construction administration duties <br />' and generated a punch list for final acceptance of the job. The project included installation of new <br />drainage structures, exfiltration trenches, asphalt overlay and striping. <br />US -1 and Douglas Road Pedestrian Overpass (2002 -2003) - Project Engineer for the construction of a <br />prefabricated steel pedestrian bridge with concrete towers, spanning over US -1 at Douglas Road. <br />Duties included the coordination of project files and logs, liaison between owner and contractor for <br />the resolution of RFI, changes, submittals, etc., negotiated and prepared change rebuttal <br />documentation, meeting minutes, verified general contract compliance and sub - consultant's <br />invoices, inspected force account work and aided in the preparation of pay requests, change orders <br />to the contract, and close -out documentation. <br />Additional Tracks at the William Lehman Center Rail Shop (2003 -2004) - Project Engineer for the <br />construction of 1.5 miles of additional railroad tracks at the Miami -Dade Transit William Lehman <br />Center Rail Shop and its connection to the existing tracks. The project also included the <br />reconditioning of an existing parking lot, and the addition of three new parking areas, deep <br />exfiltration trenches. Duties included contract administration, and daily inspections of all phases <br />and aspects of the construction process. Also prepared claim rebuttal documentation, attended <br />progress meetings, negotiated changes, and acted in the absence of the Resident Engineer. <br />Coordination with MDC, MDT, and DERM was required. <br />GEGEN2pg06.wpd <br />ICivil Works, Inc. 10 NW 42nd Ave., Suite 200, Miami, FL 33126 Ph: 305 -448 -5955 Fax: 305 - 448 -5466 <br />
The URL can be used to link to this page
Your browser does not support the video tag.