Laserfiche WebLink
CRISTINA M. GONZALEZ, P.E. <br />1 <br />Coordinated the inspections of all foundation - related work, including site work. Inspected the <br />' installation of the augercast piles, the footing and slab subgrades, parking and road subgrades, and the <br />footing reinforcing steel. <br />' Fort Lauderdale Compost Facility, Fort Lauderdale, FL - Inspected the installation and load testing of <br />vibro - replacement stone columns. Field work included checking the penetration resistances during <br />placement of the stone columns to assure that the design values were being achieved. Also assisted in <br />' the monitoring of the building for settlement by level survey. <br />Dade County Detention Center, Miami, FL - Assisted in the dewatering of foundation pile caps and <br />inspected pressure grouting operations under the lower level floors where fines had washed away <br />' during the dewatering process. <br />Waterside Plaza, Edgewater, NJ - Designed a combined culvert support system and seawall. The work <br />also included the pile design as well as the presentation of alternate designs. <br />Griffin Center, Dania, FL - Coordinated and supervised the subsurface Investigation on an existing <br />marina and boat yard rite, locating a previously existing dump for the construction of mid -rise office and <br />parking structures. The investigation included offshore borings and aerial research. <br />p g g <br />' PROFESSIONAL AFFILIATIONS <br />American Society of Civil Engineers <br />Florida Engineering Society <br />' Association of Cuban Civil Engineers <br />Omicron Delta Kappa <br />Tau !seta Pi <br />SELECTED PUBLICATION <br />"Geotechnical Improvement of Subsurface Conditions by Preloading," co- authored with K.Peter Yu and <br />Rudy P. Frizzi, Proceedings, South Florida Section ASCE Annual Meeting, Naples, Florida, 1 and 2 <br />October 1993. <br />T:\Gthsr\Mnketing \RESUMES- ALL \GENERA!. I\ 2004 \kh Riea \M Rise Gonzatsz2.Doc <br />