My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Civil Works Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(06-12-02) General Engineering Consultants
>
Responses
>
Civil Works Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:25:30 AM
Creation date
1/24/2011 4:25:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultants
Bid No. (xx-xx-xx)
06-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' MATTHEW E. MEYER, P.E. <br />iThe Marquis, Miami, FL- This development is to consist of a 67 -story condominium structure in Miami. <br />Provided technical assistance during implementation of drilled shaft load testing and production shaft program. <br />The W- Hotel, Miami Beach, FL -This development is to consist of a 20 -story hotel and connecting subterranean <br />parking garage having a FFE of el- 4 NGVD. Prepared the geotechnical engineering study report. <br />' Fairfield Dadeland, South Miami, FL- This development consists of a 25 -story high rise condominium tower. <br />Assisted in the preparation of a supplemental /peer review geotechnical study and provided high- capacity piles <br />to economize the foundation system (i.e. 420 ton piles). Also provided excavation support and dewatering <br />consultation services directly to the Contractor. Included computer MODFLOW analyses to assess drawdown, <br />permitted plans for dewatering discharge as well as excavation support design drawings for FDOT submittals. <br />Downtown Dadeland, South Miami, FL- This development consists of a mid -rise condominium and retail <br />' development with two levels of parking to be constructed below grade (i.e. at el - 10 NGVD). Observed <br />preliminary excavationtest pit pump tests, performed dewatering analyses, and observed full-scale mock -up <br />sheeted excavation with interior sump pump dewatering, associated drawdown, and pump rates. <br />Turnberry Village- Aventura, FL- This development consists of twin 15 -story apartment towers. Assisted in <br />the preparation of the geotechnical engineering study to utilize short augercast piles embedded in the upper <br />' Miami Limestone after performance oftower preloading. Provided project management oversight during all <br />phases of earthwork /preloading operations. <br />Trump International Hotel, Fort Lauderdale Beach, FL -This development is to consist of a 25 -level tower and <br />an adjacent garage and retail area. Prepared the geotechnical engineering study report and provided oversight <br />of geotechnical engineering related issues. <br />Wal -Mart Distribution Center- Fort Pierce, FL- Provided geotechnical construction consulting services to <br />expedite fill placement within the proposed building pad (i.e., 1.5 million sq. ft.). Provided recommendations <br />and construction oversight for cement modification of on -site silty and clayey sands. <br />Northwest Airlines Cargo Facility, JFK, Jamaica, NY - Assisted in preparation of the earthquake engineering <br />study and the geotechnical engineering study and evaluation. Assisted in the preparation of technical <br />plans /specifications for dynamic compaction to mitigate liquefaction and allow support of structures on <br />shallow foundations with bearing pressures of 2 tons /ft'. Provided construction inspection services during <br />dynamic compaction, heavy surface compaction at depth, subgrade preparation, and backfilling. <br />Staten island university Hospital Expansion, Staten island, NY - This development consisted of the <br />construction of 2- Linear accelerator additions, a 7 -story radiation /oncology building, a conference center, a <br />parking garage, and an addition of one story above a presently existing three story building. Assisted in the <br />' preparation of the geotechnical engineering study for recommendations of monotube pile foundations in sands. <br />Assisted in the design of an underpinning system and underpinning specifications. Provided monotube pile <br />and load test inspection services. <br />Target Store, Bethel, CN- Analyzed and designed a 20 ft high retaining wall with native sand backfill utilizing <br />A.B. Chance soil screw anchors as a reinforcement system. Evaluated use of a soldier pile and lagging <br />retention system. <br />' Target Store, Raleigh, NC - Evaluated and mapped the failure of a 30 -foot high embankment constructed on a <br />1.5H:1V slope in residual clayey silt soils. Assisted with the analysis of the slope retention /rehabilitation. <br />TAC /MGM Condominium Development & Turnberry Place, Las Vegas, NV- Performed field inspection of <br />Phase I subsurface investigation for a proposed 30 -story condominium tower, observed performance of <br />' downhole seismic testing, and performed field inspection of small -scale test pit dewatering pump tests. <br />Performed dewatering analyses for construction dewatering during mat foundation excavation of 40 -story <br />condominium tower foundations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.