My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Eiseman & Russo #3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
Eiseman & Russo #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 11:02:55 AM
Creation date
2/15/2011 3:57:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I ~(f!1~1mr' <br />I~~~~ <br />I I rID@,~ (!1l~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I EIsman <br />I &g1!~~Q <br /> <br /> <br />E&R's Plans & Specification Room <br />We offer the ability to upload or download plans to <br />our engineers through the use of our FTP site. A <br />sample of the Plans & Specification page from our <br />website www.eismanandrusso.comis shown below. <br /> <br />Elsman <br />&EJJ~~Q <br /> <br />PROJECT APPROACH <br /> <br />E&R will coordinate all aspects of the Projects <br />with the City of Sunny Isles Beach for the following <br />tasks as defined in section 1.5 of the Request for <br />Qua Iification: <br /> <br />· Construction Management, <br />· Construction Inspection, <br />· Hurricane Recovery and Debris <br />Monitoring Services, <br />· General Design Work, <br />· Preparation of complete <br />construction contract plans <br />and special provisions for the <br />assigned projects, <br />· Public involvement, <br />· Post Design Services (Shop <br />Drawing Review and Response to <br />Request for Information) <br />· Bid Administration (Selection <br />and Letting) <br /> <br />6455 P~'cnAV{),Jac.IIS00"\VlllC, fl..32217 tel: 904.7"33.1.478 !ax:004.636.882& <br /> <br /> <br />E&R STRIVES TO: <br /> <br />Listen to the client. <br />Understand the client's needs and desires. <br />Recognize the client's budget constraints. <br />Recommeml only required work. <br />Work to minimize client costs. <br />Communicate to keep the client informed of <br />project progress. <br />Execute the project in a timely fashion. <br />Follow through to provide additional <br />support as needed. <br /> <br />. <br /> <br />Our project management staff <br />maintains a high level of visibility, <br />accessibility and personal <br />participation in each project. E&R <br />has been highly successful in accomplishing the <br />work the client needs by providing a one-to-one <br />relationship. We designate a project manager, one <br />with whom the client feels comfortable, who may be <br />one of our principals, or a senior project manager, <br />and who is personally responsible for delivering to <br />the client a complete and satisfactory work product. <br /> <br />Once a project has been assigned, the E&R <br />Project Manager will review the project scope <br />and schedule with the City Staff and will assign <br />the project to a Design Team. E&R understands <br />that the Design Team must take <br />full ownership of the project and <br />maintain that sense of ownership <br />from the project inception to the <br /> <br />I).'.......," '1". <br />,I <br />o # <br />, .. <br />:: ~"l' <br />v . I <br />. . . <br />. '.. .. <br />. . ,. <br />'t. ,0" <br />.~. , I, o. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.