My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCC # 7
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
BCC # 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 9:36:02 AM
Creation date
2/16/2011 9:00:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />; <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />! . <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />~() <br /> <br />Section 4 - Project Team and Staff <br />Throughout the years BCC has forged an outstanding reputation for providing <br />quality services that meet client needs and exceed expectations. Our firm has the <br />ability and the technical resources to provide the majority of the services requested <br />in the City's RFQ. The firm and, its principals and staff have the depth, knowledge <br />and experience the City is looking for in its consultant. BCC has a total of 28 <br />employees that are trained to provide sound engineering solutions in a professional <br />and cost-effective manner. <br /> <br /> <br />--- <br /> <br />4.1 Project Staffing <br />General Engineering Services Agreements require a Project Manager (PM) with proven design <br />experience that will manage each individual assignment, deliver them on schedule, and is <br />familiar with local Standards, Specifications and Procedures. BCC's Project Manager will be Mr. <br />Manuel Benitez, PE. His experience, as well as the experience of the key members of our Team, <br />is summarized on the following pages. <br />In assembling the staff, we not only looked at the special technical capabilities of each <br />individuals, but also their current and projected workload and availability. The staff being <br />proposed to the City will be committed to for the duration of the contract. BCC Team member's <br />current workload ensures that we can easily provide the staff-hours required to service this <br />contract. <br />4.1.1 Pro,ject Manager <br />Our Project Manager, Mr. Manuel Benitez, P.E. is a principal of the firm and will have <br />responsibility for the overall management and technical direction of the contract. Mr. Benitez has <br />recent project management experience on design contracts for the Florida DOT, the Miami-Dade <br />Expressway Authority and Miami-Dade County Public Works Department. His experience <br />managing General Engineering Services agreements include: <br /> <br />. Construction Engineering and Inspection Services for the Miami-Dade County DERM - <br />Managed field inspection teams working for the Department of Recovery and Mitigation. <br />County- Wide assignments included: Beach Renourishment, Canal Dredging and Clean- <br />. up, Roadway Construction and Drainage Improvements, and Drainage Clean-Out. <br /> <br />. District-wide Minor Design for Consultant Management - Project Manager for general <br />engineering services contract for roadway improvements. $1.5 million contract with <br />multiple work orders. Assignments to date have included: milling and resurfacing and <br />ADA improvements for a 1 mile segment of Normandy Drive, Traffic Signal <br />Improvements to 10 signalized intersections along NW /NE 16ih Street, and Milling and <br />Resurfacing, Drainage Improvements, and ADA and Signal Improvements for a 2 mile <br />segment of SR 7 / US 441. <br /> <br />. MDX General Engineering Consultant - Provided construction phase services for system <br />wide improvements. Responsible for the review of structural shop drawings, product <br />approvals, and repair recommendations for projects under construction, including: 1) <br />Girder Erection Plans and Steel Repair Plans for steel box girder bridges on the SR 836 <br />Extension, 2) Toll Plaza Structures and Sign Structures for the SR 836 WB Toll Plaza, 3) <br />Miscellaneous bridge joint repairs, 4) Bridge painting and concrete repairs for SR 836 <br /> <br />7300 N Kendall Drive I Suite 660 I Miami, Florida 33156 t. 305.670.2350 <br /> <br />Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.