Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />- <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I. <br />,- <br />I. <br />I. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br />@~" City of Sunny Isles Beach - Professional General EnQineerinQ Consultant <br />~.~: RFQ No: 07-07-01 Proposal Executive Summary <br />~~, :::: :::::::: ~... <br /> <br />SECTION ONE - BUSINESS OVERVIEW / FIRM CAPABILITIES <br /> <br />A & P is highly capable of providing services for the above mentioned specialties and is qualified by <br />Miami-Dade County / FDOT for: major roadway design, construction management, highways, streets, <br />parking lot, drainage, lighting (interior, display, theater, etc.), lighting (exterior, streets, memorials, <br />athletic fields, etc.), sewage collection treatment and disposal, water supply, traffic, transportation <br />engineering and cost estimating. Likewise we are also capable of performing services of data <br />collection, manipulation and data-basing for the purposes of preparing Roadway Characteristics <br />Inventories and identification of Roadways Functional Classification. Another facet of our company is <br />the division of Construction Management and Construction Engineering and Inspection; the division <br />has a cadre of well qualified graduate engineer inspectors headed by a registered professional <br />engineer with more than 25 years of transportation engineering design and construction management <br />experience; most of our CEI staff have attended all of the required Construction Training Qualification <br />Program (CTQP) courses required by the Florida Department of Transportation and other <br />governmental agencies. <br /> <br />Our qualifications and vast experience makes us a very strong candidate to provide the services <br />required by this contract, surpassing the levels of satisfaction expected by the City. <br /> <br />Our Technical Qualifications with FDOT and Miami-Dade County are shown below: <br /> <br /> <br />Group 3 Highway Design -Roadway <br />3.1 Minor Highway Design <br />3.2 Major Highway Design <br />3.3 Complex Highway Design <br />Group 6 Traffic Eng. and Op. Studies <br />6.1 Traffic Engineering Studies <br />Group 7 Traffic Operations Design <br />7.1 Signing & Pavement Markings <br />7.2 Lighting <br />7.3 Signalization <br />Group 10 Construction Engineering Inspection <br />10.1 Roadway Const. Eng. Inspection <br />10.2 Major Bridge Construction Engineering Inspection <br />10.3 Construction Materials Inspection <br />Group 13 Planning <br />13.7 Transportation Statistics <br /> <br />...ED <br /> <br />HBE <br />1.01 Urban Area and Regional Transportation Planning <br />2.04 Mass Transit Controls, Communications & Information System <br />3.01 Site Development & Parking Lot Design <br /> <br />AI~T <br />INIt'lI"~JIliIlS A&P Consulting Transportation Engineers, Corp. <br /> <br />4 <br />