My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ceres
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
Ceres
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2011 3:56:03 PM
Creation date
3/23/2011 3:46:12 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o <br /> <br />9. Do you have any idea if the contractor can have their own temporary disposal site? <br />That is something that we did not make a provision for, it is something that can be <br />addressed, the temporary site would have to go through a review first. <br /> <br />10. As far as the vehicles, it goes through the Miami-Dade Solid Management requirement to <br />have registration stickers, that would probably be waived? <br />No, especially if you are billing on a cubic yardage basis, you cannot take any debris <br />out of the City and load up a truck until it has gone through a certification process and <br />it will be labeled and placard as the RFP dictates. That is really important, even if for <br />some reason it starts with cubic yardage and it changes to tonnage if the disposal <br />facility facilitates one faster than the other either way we don't want to take a chance <br />with any Federal funding since that has been such a huge issue so everything will be <br />definitely measured very well. <br /> <br />o <br /> <br />II. What was the major challenge after the last storm? <br />Sunny Isles Beach was fortunate in they didn't have a bid process before the last storm, <br />and they had a landscaping company that has an emergency procurement clause in <br />their contract so they were able to utilize them to just come in on an emergency basis <br />and do this removal work for them and it went fairly smoothly, they might have liked it <br />to be done a little faster because it took a little over a month, and it was about 20,000 <br />yards and they just chipped as they went and that worked pretty well, and now they <br />want to go through the formal bid process and get everything lined up, and hopefully <br />get all the resources out here that they need. In general, the biggest problem in all of <br />South Florida was the lack of education of the local applicants, the cities and the <br />counties. That is changing hopefully, there has been a lot of training going on by <br />FEMA, the State, FDOT, and to educate the applicants on a list of everything they <br />need to do before they even start the debris operation. The paperwork is one of the <br />biggest issues. That is something that will be reviewed in great detail as your <br />paperwork comes in with all ofthe information because if you are tasked with clearing <br />those Federal aid roads, that has to be segregated by either a separate invoice or <br />separate line items because that is something the City will have to track because they <br />will have to go to two different funding program for the money. So tracking first pass <br />through a community whether it is on a Federal aid road or on a non-Federal aid road <br />is very important so the load tickets in the past have not had enough detail. Load <br />tickets will be very detailed, will be legible at the site where the monitor is looking at <br />them and fully filled out so we won't be having any problems with that. The invoicing <br />needs to clearly reflect exactly what type of roadway, if it is a first pass or second pass, <br />and with all the supporting documentation, all in a line, all at once given to the City so <br />they can make sure they have everything on file and they are not missing any <br />documentation from any vendors. <br /> <br />12. Do you want us to provide the actual load tickets? <br />Solid Resources, Inc. is the monitoring firm, so we have tickets to do that. <br /> <br />o <br /> <br />SASQ917757 <br /> <br />Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.