Laserfiche WebLink
<br />. <br />. <br />'. <br />~. <br />I. <br />. <br />I. <br />. <br />I. <br />. <br />. <br />. <br />I. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />" <br /> <br />for three (3) years with two (2) one (1) year options for a total of five (5) years with an annual re- <br />certification and price adjustment based on 80% of the Consumer Price Index for the Greater Miani-Dade <br />County Area. <br /> <br />The project consists of post-disaster debris management within the City limits in two parts. <br /> <br />· Part 1 is "Debris Clearance (for access) from Public Rights-of-way and Public Property,. consisting of only <br />pushing debris from.the traveled way of city streets and public facilities to open one lane for emergency <br />vehicles. This work will be perfonned on a Time and Material price bases limited to no more than 70 hours <br />of actual work. <br /> <br />· Part 2 is "Debris Removal Operations," consisting of loading and hauRng debris from pubflC rights-of-way to an <br />approved landfill. This work win be performed on a Unn Price bases documented by valiclload tickets. <br /> <br />When identifying resources to be made avarlable under this contract, Contractor shall use a planning standard <br />approach. Specifically, Contractor must identify the expected sources and quantities/numbers of equipment and <br />personnel that will be engaged. Contractor must identify sufficient resources to ensure the avaJlabity of personnel <br />and equipment as necessaJy to initiate aft required activities within 24 hours of being so cirected and any adcitional <br />resources that might be necessary to have all required actions completed within the time frames specified <br />herein. For the purpose of identification of Contractor/Subcontractors a general equipmenVpersonnel <br />inventory will suffice. For SOOcontractors, a statement of their commitment to provide resources for this prqect must <br />be included in the submittal. The planning standard to be used is removal and disposal of approximately 40,000 <br />cubic yards of mixed debris wittln a prescribed operating period of not more than ~ days. <br /> <br />7.7. SEE SECTION 3, INSTRUCTIONS TO PROPOSER FOR PROPOSAL PROCESS, SECTION 4, <br />GENERAL PROVISIONS, and SECTION 9, PROPOSER QUAUFlER STATEMENT <br /> <br />7.8. EVALUATION OF PROPOSALS <br /> <br />7A1. Potential Contractors will be evaluated for the project based on evidence and statements of <br />compIiancel1ntent provided in their Proposals. First, the City wiD determine which Contractors are capable of <br />entering into a contract with the City by satisfying Mandatory Qualification and as ouUined in Sectioo 3, Section 4, <br />and Section 9 thus making them e1iQlble for consideration. Then, the City will determine which eligible <br />Contractors satisfy the Project Requirements, thus deeming them qualified for the project. Only qualified <br />Contractors will move on to the second stage of the evaluation, i.e. consideration of their Project Approach and <br />Fee Proposals for the services descrbed by this RFP package. <br /> <br />7 B2. The City reserves the right to deny consideration to any Contractor that does not satisfy the Mandatory <br />Qualification Criteria or is not capable of satisfying the Project Requirements. However, the City may waive defects, <br />irregularities or informalities in the quaRfication process or in any response to the process that, in the City's <br />opinion, seems advantageous to the City and in the best interest of the public. <br /> <br />39 <br />