My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Phillips & Jordan
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
Phillips & Jordan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2011 4:15:19 PM
Creation date
3/25/2011 4:14:35 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris Clearing
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..... <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />,...., <br /> <br />7.9. STANDARD SPECIFICATIONS FOR DEBRIS REMOVAL <br /> <br />7.9.1. Scope of Work: Work consists of hurricane, tornado or major dsaster debris clearing and removal fran pLblic <br />P.rty and the public rights-of-way within the City limits and proper lisposal of the debris. The work consists of <br />loading and hauling debris from public rights-of-way to an approved landfill. <br /> <br />792. Prepand1ess; Key personnel, proposed by the Contra1or under the pre-qua6ficalion precess, must participate in <br />the City's annual disaster preparedness training activities, a maximum of two (2) days each year at no cost <br />to the City. <br /> <br />7.9.3. Preposltionlng: Upon activation of the contract, contractor must provide a two-person management team <br />on-site within 12 hours of receipt of the Notice to Proceed. The purpose is to initiate actions necessary to <br />ensure that contractor resources will be able to begin recovery operations within 24 hours of receiving the Notice <br />to Proceed from the City. <br /> <br />7.9A. inspection of Debris: Iv) soon as possbIe after the disaster event has Sli>Sded, the Contractor must make a <br />detailed and thorough on-site inspection of debris to be removed, and consider (1) amounts and types of <br />debris; (2) working conditions such as traffic, streeVroad width, and land use; (3) means to ingress and <br />egress to work areas; and (4) all other factors affecting the removal and disposal work. <br /> <br />7.95. Coordination: Debris removal is limited to that which is detennined by the City Debris Manager to be in the best <br />public interest and that which is considered essential to the economic recovery of the affected area. The City <br />Debris Manager will detennine priorities for debris removal. The Contractor must coordinate closely with and take <br />direction from the City Debris Manager. The Contractor must coordinate with other contractors and other public <br />and private entities also perfonning recovery operations. <br /> <br />7.9.6. CIty Units: Work is limited to specified areas within the Oty of Sunny Isles Beach. <br /> <br />7.9.7 Quality Assurance: Work will be closely monitored by City personnel, and/or its desiglee. The Contractor <br />ITlISt cooperate with all monitors representing the City and the Federal Enlergerlcy Management NpY;:y (FEMA). <br /> <br />7.10. DEBRIS REMOVAL <br /> <br />7.10.1. General: The goal of the debris removal work is to clear, load, and haul debris from public property and the public <br />rights-of-way to an approved landfill. In general, but not exclusively, this consists of curbside debris removal on <br />Oty property. The types of debris to be removed include, but are not Umited to trees, woojy debris, brush, buiking <br />wreckage, construction and demd'llion debris (C&D), and personal property and household goods on pOOlic property <br />or in pltic rights-of-way. Hazardous materials are not covered by this scope of work. <br /> <br />7.1a2. PreparaUonlSubmlttal: Prior to commencing any removal work, the beds of all hauling vehicles must be <br />measured to detennine their fully loaded capacities. All measurements must be made by a joint City or its <br />designee/Contractor team. The vehicles must be marked extemally with the owner/operato~s name, the contract <br />number, vehicle ID nlrnber and the fully loaded capacity. Those markings must be clearty visible on both sides of <br />the vehicle. Those markings must be placed on both sides and the front wall of the bed. Markings must be <br />certified by the City or its designee and Contractor. A rlSl of all vehicles, with the owner/operators name, vehicle ID <br />number and hau6ng capacity must be submitted to the City Debris Manager before the vehicles are placed i1 <br />service. The City will provide five (5) part load tickets for each vehicle at each debris loading site. The load <br />tickets must be presented to the City's monitor at the designated disposal site. <br /> <br />7.1Q3. Hazardous Materials: Hazardous and toxic wastes will be loaded, hauled, and disposed of by others and are <br />excluded from this work. The City may execute a separate hazardous materials removal and disposal COIltra:t; <br />however, cdlection schedules may not necessariJy coincide with the debris removal work. Hazardous materials <br />include chemicals, petroleum products, paint products, asbestos, power transfonners, oxygen bottles, <br />propane tanks, batteries, industrial and agricultural chemicals, cleaning agents and similar hazardous, <br />dangerous or toxic materials. Some prelininary curbside separation will be attempted, but contractor must be <br />aware that hazardous materials might be commingled with debris. Contractor shan take every precautioo to <br />avoid loading and hauling hazardous' materials. Notwithstanding, contractor forces must be aware of the <br /> <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.