Laserfiche WebLink
<br />c <br /> <br />o <br /> <br />~ <br /> <br />OPERA TIONAL ENVIRONMENTAL PROTECTION - All work performed at and/or in <br />relation to a debris-staging site will be performed in a skilled and workman-like manner. All <br />debris staging site operations shall be conducted in accordance with the Company's <br />Environmental Protection Plan and to ensure compliance with the Corporate Accident Prevention <br />Plan as part of the Corporate Safety Plan. <br /> <br />CLOSURE PROCEDURES - Pre-use inspection and documentation infonnation shall be utilized <br />as a guide to restore each site to pre-use condition. <br /> <br />REMOVAL OF DEBRIS - Debris residue, not taken to the appropriate disposal site during <br />debris disposal operations, shall be collected, recorded and hauled to the appropriate disposal <br />site. ORC or a licensed hazardous waste remediation company shall be retained to accomplish <br />the removal of all hazardous and/or toxic waste from each site, if not already accomplished under <br />separate agreement by the Government. <br /> <br />REMOVAL OF TEMPORARY STRUCTURES - All temporary structures such as fencing, <br />inspection towers, temporary offices, sanitary facilities, etc., shall be removed from each site. <br /> <br />LANDSCAPE OPERATIONS - Each site shall be graded, as required to return the topography <br />to pre-use elevations, unless otherwise directed by Government task order. Each site will be <br />vegetatively restored to pre-use condition by seeding, fertilizing and laying of straw as well as <br />replacement of agreed-upon shrubs and/or trees. <br /> <br />CLOSURE DOCUMENT A TION - The procedures described in Section F3 of this plan shall be <br />followed for closure documentation. <br /> <br />FINAL INSPECTION, RELEASED AND ACCEPTANCE OF GOVERNMENT AND/OR <br />LANDOWNER - ORe' Senior Management, the Supervisor responsible for a particular site, the <br />Governments Representative and if applicable, the landowner shall constitute an inspection team. <br />The Company Supervisor responsible for the applicable site shall have, for examination by all <br />Inspection Team members, the documentation package to include pre-use and closure inspection <br />documentation as well as all chronological documentation created during the operational period. <br />After all inspection team members accept the post-closure condition of each site, a release and <br />hold-harmless for the Company shall be signed by the Government and/or landowner, releasing <br />ORC of any further responsibility and liability. <br /> <br />40 <br />