My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2004 AlA <br /> <br />MASTERSPEC <br /> <br />08/04 <br /> <br />1. Attendees: Installer and representatives of manufacturers and fabricators involved in or <br />affected by the installation and its coordination or integration with other materials and <br />installations that have preceded or will follow, shall attend the meeting. Advise <br />Architect and Construction Manager of scheduled meeting dates. <br />2. Agenda: Review progress of other construction activities and preparations for the <br />particular activity under consideration, including requirements for the following: <br /> <br />a. The Contract Documents. <br />b. Options. <br />c. Related RFls. <br />d. Related Change Orders. <br />e. Purchases. <br />f. Deliveries. <br />g. Submittals. <br />h. Review of mockups. <br />1. Possible conflicts. <br />J. Compatibility problems. <br />k. Time schedules. <br />1. Weather limitations. <br />m. Manufacturer's written recommendations. <br />n. Warranty requirements. <br />o. Compatibility of materials. <br />p. Acceptability of substrates. <br />q. Temporary facilities and controls. <br />r. Space and access limitations. <br />s. Regulations of authorities having jurisdiction. <br />t. Testing and inspecting requirements. <br />u. Installation procedures. <br />v. Coordination with other work. <br />w. Required performance results. <br />x. Protection of adjacent work. <br />y. Protection of construction and personnel. <br /> <br />3. Record significant conference discussions, agreements, and disagreements, including <br />required corrective measures and actions. <br />4. Reporting: Distribute minutes of the meeting to each party present and to parties who <br />should have been present. <br />5. Do not proceed with installation if the conference cannot be successfully concluded. <br />Initiate whatever actions are necessary to resolve impediments to performance of the <br />Work and reconvene the conference at earliest feasible date. <br /> <br />D. Progress Meetings: Conduct progress meetings at weekly intervals. Coordinate dates of <br />meetings with preparation of payment requests. <br /> <br />1. Attendees: In addition to representatives of Owner, Construction Manager, and <br />Architect, each contractor, subcontractor, supplier, and other entity concerned with <br />current progress or involved in planning, coordination, or performance of future activities <br />shall be represented at these meetings. All participants at the conference shall be familiar <br />with Project and authorized to conclude matters relating to the Work. <br /> <br />PROJECT MANAGEMENT AND COORDINATION <br /> <br />01310-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.