Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />copies printed from record plots. Plot and print each Drawing, whether or not <br />changes and additional information were recorded. <br /> <br />1) Electronic Media: CD-R. <br /> <br />B. Record Specifications: Submit 3 copy of Project's Specifications, including addenda and <br />contract modifications. <br /> <br />C. Record Product Data: Submit 3 copy of each Product Data submittal. <br /> <br />1. Where Record Product Data is required as part of operation and maintenance manuals, <br />submit marked-up Product Data as an insert in manual instead of submittal as Record <br />Product Data. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 RECORD DRAWINGS <br /> <br />A. Record Prints: Maintain one set of blue- or black-line white prints of the Contract Drawings <br />and Shop Drawings. <br /> <br />1. Preparation: Mark Record Prints to show the actual installation where installation varies <br />from that shown originally. Require individual or entity who obtained record data, <br />whether individual or entity is Installer, subcontractor, or similar entity, to prepare the <br />marked-up Record Prints. <br /> <br />a. Give partkular attention to information on concealed elements that would be <br />difficult to identify or measure and record later. <br />b. Accurately record information in an understandable drawing technique. <br />c. Record data as soon as possible after obtaining it. Record and check the markup <br />before enclosing concealed installations. <br /> <br />2. Content: Types of items requiring marking include, but are not limited to, the following: <br /> <br />a. Dimensional changes to Drawings. <br />b. Revisions to details shown on Drawings. <br />c. Depths of foundations below fIrst floor. <br />d. Locations ,md depths of underground utilities. <br />e. Revisions to routing of piping and conduits. <br />f. Revisions to electrical circuitry. <br />g. Actual equipment locations. <br />h. Duct size and routing. <br />1. Locations of concealed internal utilities. <br />j. Changes made by Change Order or Construction Change Directive. <br />k. Changes made following Architect's written orders. <br />1. Details not on the original Contract Drawings. <br />m. Field records for variable and concealed conditions. <br />n. Record irIDJrmation on the Work that is shown only schematically. <br /> <br />PROJECT RECORD DOCUMENTS <br /> <br />01781 - 2 <br />