My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&p Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
A&p Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 4:37:50 PM
Creation date
2/9/2012 4:35:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
CVS
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />} <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />Request for Qualifications <br />Civil Engineering Services to Design Street and Drainage Improvements RFQ#11-11-02 <br /> <br /> <br />Washington Avenue Improvements <br />Phases II, IV & V <br />City of Miami Beach, Florida <br /> <br />Project Location: <br />Washington Ave. from 5th Street to Lincoln Rd. <br />Miami Beach, Florida <br />Client: City of Miami Beach Florida <br />Capital Improvements Project Office <br />1700 Convention Center Dr. <br />Miami Beach, Florida <br />Contact: Fernando Vazquez, P.E. <br />Phone No.: (305) 673-7080 <br />Fax No.: (305) 673-7073 <br />Email: fernandovazquez@miamibeachfl.gov <br />Contract Number: 22-02/03-04/04 <br />Contract Value: $1,300,000 <br />Initial/Final Construction Cost: $12,104,429/ $15,200,000 <br />Contract Starting Date: April 2004 <br />Initial/Final Completion Date: May 2005 / May 2006 <br /> <br />Scope of Work - Designer of record for this Design-Build Project. <br />Prepare construction documents (plans and specifications) for the <br />following improvements: milling & resurfacing, new gravity drainage <br />wells, sanitary sewer capacity improvements which consist of <br />pipe/manhole up-sizing, water main upgrades, relocation of water <br />meters/meter boxes, new decorative lighting system, landscape and <br />irrigation upgrades, replacement of curb & gutter and sidewalk from <br />11th St. to 16th St., design of intersection bumps-outs, compliance with <br />ADA requirements, modification of parking space layout, relocation of <br />existing utilities, coordination with the CMB Parking Department to <br />remove and reinstall parking meter heads and parking signs, and <br />signature median improvements from 5th St. to 6th St., and between 16th I <br />Street and Lincoln Rd. Also responsible for the office administration <br />construction progress activities related to the construction of this right- <br />of-way improvement project. Some of the construction management <br />services provided for this project included: <br />. Weekly construction meeting/coordination to monitor <br />. Perform all shop drawing program functions <br />. Respond to request for information (RFI's) <br />. Evaluate request for changes to project schedules <br />. Contract documents clarifications <br />. Inspect all MOT operations <br />. Review, track and maintain construction schedules <br /> <br />A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. <br /> <br /> <br /> <br />~ <br /> <br />1 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.