My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&p Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
A&p Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 4:37:50 PM
Creation date
2/9/2012 4:35:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
CVS
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />Request for Qualifications <br />Civil Engineering Services to Design Street and Drainage Improvements RFQ#11-11-02 <br /> <br /> <br />MIC Stormwater Management Master Plan, Miami-Dade County, Florida <br /> <br />Project Location: <br />Miami Intermodal Center, from SR-836 in the south to NW 36 St. in the north and from Le Jeune Rd to the west to NW <br />37 Ave. to the east, Miami-Dade, Florida <br />Client: Florida Department of Transportation District VI <br />1000 NW ll1th Ave., Miami, Florida <br />Contact: Ricardo Salazar, P.E. - Drainage Engineer <br />Phone No.: (305) 470-5264 <br />Fax No.: (305) 470-5293 <br />Email: ricardo.salazar@dot.state.fl.us <br />Contract Number: 249643-1-56-01 <br />Contract Value: <br />$182,766.00 <br />Construction Cost: <br />$10,940,800.00 <br />Contract Starting Date: <br />March 2000 <br />Contract Completion Date: <br />March 2003 I'"'' <br /> <br /> <br />Scope of Work - Prepare a Stormwater Management Master Plan for the entire MIC area. The Stormwater <br />Management Master Plan included coordination with 5 design Teams and several permitting agencies in order to <br />develop a master drainage system with more than 450 drainage structures and 18 retention ponds that will serve the <br />project area. This effort also included the preparation of permit packages approved by SFWMD, DERM, USACOE and <br />FAA. The MIC is a multimodal transportation facility that links Metrorail, Amtrak, Tri-Rail, and Metrobus. <br /> <br /> <br />A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.