My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&p Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
A&p Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 4:37:50 PM
Creation date
2/9/2012 4:35:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
CVS
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
) <br />) <br />., <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />APCTE Tenure: 7 yrs <br /> <br />Industry Experience: 14 yrs <br /> <br />Office Location: Doral <br /> <br />Registration: <br />2002, Florida Professional Engineer <br />NO.58820 <br /> <br />Education: <br />Bachelor of Science in Civil Engi- <br />neering, 1997. Honored Magna Cum <br />Lau, Honor Student and Dean's List. <br />Florida International University, <br />Miami FL 33199. <br /> <br />Experience: <br />Project Manager, 2005 to present: <br />APCTE. <br />Project Engineer, 2002 to 2005: <br />FOOT District VI. <br />PE Trainee, 1997 to 2002: <br />FOOT District VI <br /> <br /> <br />KEY PERSONNELRESUME ~ <br />A&P CONSULTING TRANSPORTATION ENGINEERS ~ <br /> <br />. ALEXANDER S. YI, P.E. PAGE 1/2 <br /> <br />Roadway Design <br /> <br />A Civil Engineering Graduate and a Professional Engineer Registered in the State of <br />Florida. Mr. Yi, has over fourteen years of professional experience in the fields of De- <br />sign and Management of all types of Rural and Urban Roadways. Within the seven <br />years, four were spent as a Professional Engineer Trainee at FOOT District VI, and two <br />as a Project Engineer at FOOT District VI Internal Design Office. As a Project Engineer, <br />Mr. Yi was in charge of the preparation of all components of a complete Contract Plans <br />Set. These components included: Roadway, Signing and Pavement Marking, Signal- <br />ization, and Lighting. In 2003, he was appointed to the Department's CADD Roadway <br />Technical Advisory Committee (RTAC) representing District VI. RTAC is a perpetual <br />statewide self-directed work team representing all roadway CADD users of computer <br />systems and programs. Each member provides technical input to the direction of CADD <br />and related production tools in FOOT. Mr. Yi is also certified by the FOOT for prepara- <br />tion of Advanced Maintenance of Traffic Plans, and is very familiar with the Depart- <br />ment's ERC system, Specifications preparation and Electronic Delivery. <br /> <br />KEY PROJECTS: <br /> <br />SR.8091 MILITARY TRAIL <br />Client: Florida Dept. ofTransportation, 0-4; Reference: Thuc Le, P.E.; (954) 777-4552; <br />Length: 3.6 miles; Project Duration: 9/2008 -12/2010. Project Scope: Milling & Resur- <br />facing of a 3.6 miles of the existing roadway. The basic design services provided with <br />the scope of services included the preparation of the RRR Report in accordance with <br />Chapter 25 of the PPM, the preparation of design exceptionslvariations, the utility co- <br />ordination in accordance with Chapter 9 of the UAM, local government coordination, <br />public involvement, preparation of roadway plans, preparation of signing & pavement <br />markings plans, preparation of signalization plans, preparation of the Specifications <br />Package, conduct 4 phase submittals, update project schedule, maintenance of con- <br />tract, preparation of the electronic delivery of plans & specifications, and update/main- <br />tenance of the cost estimate. <br /> <br />SR.8041 BOYNTON BEACH BOULEVARD <br />Client: Florida Dept. of Transportation, D-4; Reference: Henry Oaikhena, P.E.; (954) <br />777-4450; Length: 1.3 miles; Project Duration: 6/2003 - 7/2005. Project Scope: Milling <br />& resurfacing of a 1.3 miles of the existing roadway. The basic design services provided <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS . <br />
The URL can be used to link to this page
Your browser does not support the video tag.