My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&p Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
A&p Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 4:37:50 PM
Creation date
2/9/2012 4:35:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
CVS
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br /> <br />)} <br /> <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />APCTE Tenure: 5 yrs <br />Industry Experience: 6 yrs <br /> <br />Office Location: Doral, Florida <br /> <br />Registration: <br />2006, Florida Professional Engineer <br />No.71400 <br /> <br />Education: <br /> <br />Masters In Science - Civil Engineer. <br />ing Fall 2005 <br />Florida International University, Miami, <br />Florida <br /> <br />Bachelor in Science - Civil Engi- <br />neering Fall 2004 <br />University of New Orleans, New Or- <br />leans, LA, August 1994 <br /> <br />Experience: <br /> <br />Project Engineer 2004 - Present <br />A&P Consulting Transportation Engi- <br />neers, Miami, Florida <br /> <br />Honors I Associations: <br /> <br />American Society of Civil Engineers <br />Institute of Transportation Engineers - <br />President <br /> <br /> <br />KEY PERSONNELRESUME ~ <br />A&P CONSULTING TRANSPORTATION ENGINEERS ~ <br /> <br />. JORGE PENA, P.E. PAGE 1/2 <br /> <br />Roadway Design <br /> <br />Mr. Pefia has over 6 years of experience working as a Transportation Engineer in con- <br />junction with the Florida Department of Transportation and local agencies, Mr. Pefia <br />has worked on a number of projects including RRR and Roadway Reconstruction proj- <br />ects. Within these projects, Coordinated signalization plan permits at Miami-Dade <br />County. And Supervised CADD Technicians in the preparation of roadway, signing and <br />marking, signalization and water main plans. Mr. Pefia has conducted Roadway Plans, <br />Signing and Pavement Marking Plans, and Signalization Plans using CADD system <br />(Microstation) and Geopak software as well as pertinent standards, He has designed <br />and managed several (water & sewer) projects for Miami-Dade Water and Sewer <br />Department and the City of Miami Beach, including pipeline design, Technical Special <br />Provisions, Utilities and Permits Coordination. Generated CADD and produced quanti- <br />ties using Geopak for the Computation Book, computed areas, volumes and geomet- <br />ric data required. <br /> <br />KEY PROJECTS: <br /> <br />SR-5/NORTH ROOSEVELT BLVD JOSE MARTI DR. TO SR.51 US-1 - PROPOSED <br />18",16",12" AND 8" PVC I DUCTILE IRON WATER MAINS <br />Client: FDOT District 6. Reference: Ali Toghiani, P.E.; # (305) 470-5547; Length: 2.95 <br />miles; Project Duration: 4/2009 to 3/2011.The scope of this project was to design Util- <br />ity Work by Highway Contractor Agreement Plans of 27,348 LF of 18" PVC/Ductile Iron <br />water transmission main and 16", 12" and 8" PVClDuctile Iron water distribution mains <br />along the project corridor, including stub-out at each side street intersection, new fire hy- <br />drants, fire lines in full compliance of the latest Fire Department Codes, and relocation <br />of water meters and backflow preventer to the new main. Scope also included coordi- <br />nation with roadway designers, all utility companies within the corridor, obtaining all re- <br />lated permits (Monroe County Fire Department Health Department and DEP), and <br />developing technical special provisions. This project was part of Joint Participation <br />Agreement (JPA) between the Florida Keys Aqueduct Authority and FDOT. <br /> <br />SR-5/US.1 AT C-103 SFWMD CANAL - PROPOSED 12" STEELAND DUCTILE IRON <br />WATER MAIN AERIAL CANAL CROSSING <br />Client: FDOT District 6. Reference: Adriana Manzanares, P.E.; # (305) 470-5283; <br />Length: 1.63 miles; Project Duration: 8/2009 to 6/2010. scope of this project was to de- <br />sign Utility Work by Highway Contractor Agreement Plans for a proposed 12" water dis- <br />tribution main aerial canal crossing relocation across the South Florida Water <br />Management District C-1 03 Canal. The existing water main needed to be relocated due <br />to bridge widening. Scope also included the preparation of Technical Special Provi- <br />sions, design analysis, coordination with structural and roadway designers, preparing <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS . <br />
The URL can be used to link to this page
Your browser does not support the video tag.