Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />; <br /> <br /> <br />APCTE Tenure: 9 yrs <br /> <br />Industry Experience: 9 yrs <br /> <br />Office Location: Doral <br /> <br />Education: <br />Bachelor of Science in Civil Engi- <br />neering, 2002. Florida International <br />University, Miami FL 33199. <br /> <br />Registration: <br />2004, Florida Engineering Intern Cer- <br />tification # 1100008841 <br /> <br />Education: <br />Bachelors in Sciencein Civil Engineer- <br />ing April 2002, Florida International <br />University, Miami, FI, August 1994 <br /> <br />Experience: <br />Project Engineer2004 - Present <br />A&P Consulting Transportation Engi- <br />neers, Miami, Florida <br /> <br />Civil Engineer Intern <br />Camero & Associates, Inc <br />Miami, Florida <br /> <br /> <br />KEY PERSONNELRESUME ~ <br />A&P CONSULTING TRANSPORTATION ENGINEERS ~ <br /> <br />. L1SSETTE GUON, E.!. PAGE 1/2 <br /> <br />Roadway Design <br /> <br />Mrs. Guon has more than 9 years of experience working as a Transportation Engineer <br />in conjunction with the Florida Department of Transportation and local agencies. As a <br />Project Engineer, Mrs. Guon has worked on a number of projects including RRR and <br />Roadway Reconstruction projects. Within these projects, Mrs. Guon has conducted <br />Design and Draft Roadway Plans, Signing and Pavement Marking Plans, and Signal- <br />ization Plans using CADD system and Geopak software. Created and reviewed typical <br />sections, horizontal and vertical alignments. Prepare review and update Roadway plans <br />and other construction documents in accordance with the FOOT Plans Preparation <br />Manual, FOOT Design Standards and Manual of Uniform Traffic Control Devices, Gen- <br />erated CADD produced quantities using Geopak for the Computation Book, compute <br />areas, volumes and geometric data required. Prepared Cost Estimates Analysis and <br />establish projects in the Construction Estimating System (CES) <br /> <br />KEY PROJECTS: <br /> <br />SR-8091 MILITARY TRAIL <br />Client: Florida Dept. ofTransportation, D-4; Reference: Thuc Le, P,E.; (954) 777-4552; <br />Length: 3.6; Project Duration: 9/2008 - 12/2010, Project Scope: Milling & resurfacing <br />of a 3,6 miles of the existing roadway. The basic design services provided with the <br />scope of services included the preparation of the RRR Report in accordance with Chap- <br />ter 25 of the PPM, the preparation of design exceptionslvariations, the utility coordina- <br />tion in accordance with Chapter 9 of the UAM, local government coordination, public <br />involvement, preparation of roadway plans, preparation of signing & pavement markings <br />plans, preparation of signalization plans, preparation of the Specifications Package, <br />conduct 4 phase submittals, update project schedule, maintenance of contract, prepa- <br />ration of the electronic delivery of plans & specifications, and updatelmaintenance of the <br />cost estimate. <br /> <br />SR-804/ BOYNTON BEACH BOULEVARD <br />Client: Florida Dept. of Transportation, D-4; Reference: Henry Oaikhena, P.E.; (954) <br />777-4450; Length: 1.3; Project Duration: 6/2003 - 7/2005. Project Scope: Milling & <br />resurfacing of a 1.3 miles of the existing roadway. The basic design services provided <br />with the scope of services included the preparation of the RRR Report in accordance <br />with Chapter 25 of the PPM, the preparation of design exceptionslvariations, the utility <br />coordination in accordance with Chapter 9 of the UAM, local government coordination, <br />public involvement, preparation of roadway plans, utility coordination, bridge widening <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS . <br />