Laserfiche WebLink
) <br />) <br />) <br />) <br />) <br />) <br />, <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />APCTE Tenure: 27 yrs <br /> <br />Industry Experience: 8 yrs <br /> <br />, <br />, <br /> <br />) <br /> <br />Office Location: Doral, Florida <br /> <br />Education <br />BS, Civil Engineering 1997 <br />Florida International <br />University <br /> <br /> <br />KEY PERSONNELRESUME ~ <br />A&P CONSULTING TRANSPORTATION ENGINEERS ~ <br /> <br />. JUAN MUNIZ PAGE 1/2 <br /> <br />Roadway Design <br /> <br />Mr. Mufjiz has over 27 years of extensive experience in Transportation and related proj- <br />ects, including Airports and Civil Site Work, in which 10 years have been with the Florida <br />Department of Transportation's District Six Office. Mr. Muniz transportation engineering ex- <br />perience includes project management, roadway design, site civil design, utility coordina- <br />tion, signing and pavement marking design, public involvement and signal design. Extensive <br />knowledge and experience with Microstation, Geopack, AutoCAD, as well as Microsoft Of- <br />fice, Excel and Power Point, and the preparation of project proposal and presentations. <br /> <br />KEY PROJECTS: <br /> <br />SR.809/ MILITARY TRAIL <br />Client: Florida Dept. of Transportation, D-4; Reference: Thuc Le, P.E.; (954) 777-4552; <br />Length: 3.6 miles; Project Duration: 9/2008 -12/2010. Milling & resurfacing of a 3.6 miles <br />of the existing roadway. The basic design services provided with the scope of services in- <br />cluded the preparation of the RRR Report in accordance with Chapter 25 of the PPM, the <br />preparation of design exceptions/variations, the utility coordination in accordance with <br />Chapter 9 of the UAM, local government coordination, public involvement, preparation of <br />roadway plans, preparation of signing & pavement markings plans, preparation of signal- <br />ization plans, preparation of the Specifications Package, conduct 4 phase submittals, up- <br />date project schedule, maintenance of contract, preparation of the electronic delivery of <br />plans & specifications, and updatelmaintenance of the cost estimate Public Involvement. <br /> <br />SR.804/ BOYNTON BEACH BOULEVARD <br />Client: Florida Dept. of Transportation, D-4; Reference: Henry Oaikhena, P.E.; (954) 777- <br />4450; Length: 1.3 miles; Project Duration: 6/2003 - 7/2005. Milling & resurfacing of a 1.3 <br />miles of the existing roadway. The basic design services provided with the scope of serv- <br />ices included the preparation of the RRR Report in accordance with Chapter 25 of the <br />PPM, the preparation of design exceptions/variations, the utility coordination in accordance <br />with Chapter 9 of the UAM, local government coordination, public involvement, preparation <br />of roadway plans, utility coordination, bridge widening over 1-95 & CSX Railroad, Signal- <br />ized intersections, Median Landscape, I.T.S, improvements, Textured crosswalks, Signing <br />and Pavement Markings, ADA Compliance, MOT, preparation of the specification pack- <br />age, conducted four (4) phase submittals, update project schedule and cost estimate and <br />preparation of electronic delivery of plans and specifications. <br /> <br />MIAMIINTERMODAL CENTER RENTAL CAR CENTER <br />Client: Florida Dept. ofTransportation, D-6; Reference: Gary Donn, P.E.; (305) 470-5145; <br />Length: N/A; Project Duration: 5/2005 - 5/2010. Design and development of the Site Civil <br />Design and Utility Coordination for the proposed Rental Car Facility This 3.4 million square <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS . <br />