)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />,
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />)
<br />
<br />
<br />APCTE Tenure: 27 yrs
<br />
<br />Industry Experience: 8 yrs
<br />
<br />,
<br />,
<br />
<br />)
<br />
<br />Office Location: Doral, Florida
<br />
<br />Education
<br />BS, Civil Engineering 1997
<br />Florida International
<br />University
<br />
<br />
<br />KEY PERSONNELRESUME ~
<br />A&P CONSULTING TRANSPORTATION ENGINEERS ~
<br />
<br />. JUAN MUNIZ PAGE 1/2
<br />
<br />Roadway Design
<br />
<br />Mr. Mufjiz has over 27 years of extensive experience in Transportation and related proj-
<br />ects, including Airports and Civil Site Work, in which 10 years have been with the Florida
<br />Department of Transportation's District Six Office. Mr. Muniz transportation engineering ex-
<br />perience includes project management, roadway design, site civil design, utility coordina-
<br />tion, signing and pavement marking design, public involvement and signal design. Extensive
<br />knowledge and experience with Microstation, Geopack, AutoCAD, as well as Microsoft Of-
<br />fice, Excel and Power Point, and the preparation of project proposal and presentations.
<br />
<br />KEY PROJECTS:
<br />
<br />SR.809/ MILITARY TRAIL
<br />Client: Florida Dept. of Transportation, D-4; Reference: Thuc Le, P.E.; (954) 777-4552;
<br />Length: 3.6 miles; Project Duration: 9/2008 -12/2010. Milling & resurfacing of a 3.6 miles
<br />of the existing roadway. The basic design services provided with the scope of services in-
<br />cluded the preparation of the RRR Report in accordance with Chapter 25 of the PPM, the
<br />preparation of design exceptions/variations, the utility coordination in accordance with
<br />Chapter 9 of the UAM, local government coordination, public involvement, preparation of
<br />roadway plans, preparation of signing & pavement markings plans, preparation of signal-
<br />ization plans, preparation of the Specifications Package, conduct 4 phase submittals, up-
<br />date project schedule, maintenance of contract, preparation of the electronic delivery of
<br />plans & specifications, and updatelmaintenance of the cost estimate Public Involvement.
<br />
<br />SR.804/ BOYNTON BEACH BOULEVARD
<br />Client: Florida Dept. of Transportation, D-4; Reference: Henry Oaikhena, P.E.; (954) 777-
<br />4450; Length: 1.3 miles; Project Duration: 6/2003 - 7/2005. Milling & resurfacing of a 1.3
<br />miles of the existing roadway. The basic design services provided with the scope of serv-
<br />ices included the preparation of the RRR Report in accordance with Chapter 25 of the
<br />PPM, the preparation of design exceptions/variations, the utility coordination in accordance
<br />with Chapter 9 of the UAM, local government coordination, public involvement, preparation
<br />of roadway plans, utility coordination, bridge widening over 1-95 & CSX Railroad, Signal-
<br />ized intersections, Median Landscape, I.T.S, improvements, Textured crosswalks, Signing
<br />and Pavement Markings, ADA Compliance, MOT, preparation of the specification pack-
<br />age, conducted four (4) phase submittals, update project schedule and cost estimate and
<br />preparation of electronic delivery of plans and specifications.
<br />
<br />MIAMIINTERMODAL CENTER RENTAL CAR CENTER
<br />Client: Florida Dept. ofTransportation, D-6; Reference: Gary Donn, P.E.; (305) 470-5145;
<br />Length: N/A; Project Duration: 5/2005 - 5/2010. Design and development of the Site Civil
<br />Design and Utility Coordination for the proposed Rental Car Facility This 3.4 million square
<br />
<br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS .
<br />
|