Laserfiche WebLink
<br />~l <br /> <br />rl <br /> <br />r 1 <br />I <br /> <br />r 1 <br />, J <br /> <br />, 1 <br /> <br />I r 1 <br /> <br />r 1 <br /> <br />r 1 <br /> <br />r 1 <br /> <br />, . <br /> <br />r I <br /> <br />, J <br /> <br />, J <br /> <br /> <br />OWNER <br />City of Miramar <br />Department of Operational <br />Services <br /> <br /> <br />CLIENT CONTACT <br />PBS&J <br />Roberto S. Ortiz, P .E. <br />786.299.2070 <br /> <br />COMPLETION DATE <br />2009 (Construction) <br /> <br />CONSTRUCTION COST <br />$25,000,000 <br /> <br />DESCRIPTION <br /> <br />The City of Miramar is ranked among the top ten fastest growing cities in the United States. This growth <br />necessitated the implementation of major infrastructure improvements in the eastern section of the <br />City, which is over 50 years old. The project area was bounded by Miramar Parkway on the north, <br />State Road 7 on the east, County Line Road on the south, and SW 64th Avenue on the west, all of <br />which encompassed a total of 52 roadway segments. <br /> <br />The area was operating on individual septic tanks, so approximately 5 miles of water main were <br />upgraded to 6- and 8-inch DIP water main and approximately 5 miles of gravity sewer were <br />constructed throughout the area. This commensurate increase in flow warranted the upgrade of a <br />local pump station. The pump station received new pumps, a new wet well, and an updated <br />electrical panel. <br /> <br />CES provided engineering design services and construction engineering and inspection services <br />during the construction and installation of the following: <br /> <br />./ Coordination of construction activities <br />./ Contract administration support <br />./ Progress payment review and approval <br />./ Participation in progress meetings <br />./ Responses to all requests for information <br />./ Interfacing with the design consultant to address field changes <br />./ Coordination between the contractor, engineers, and city staff <br /> <br />CES field personnel also oversaw the implementation of Maintenance of Traffic plans, supervised the <br />contractor's surveyors, notified residents of upcoming construction activities, and coordinated work <br />with City staff as needed. <br /> <br />City of Sunny Isles Beach Continuing Professional Architectural & Engineering Services RFQ 12-04-02 I 11 <br />