My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc. - Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
CES Consultants, Inc. - Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:03:10 PM
Creation date
5/7/2012 1:29:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural & Eng. Svcs Firms Only
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~l <br />rl <br />~ 1 <br /> <br />r 1 <br />I <br />f <br /> <br />r 1 <br />I <br /> <br />r 1 <br />j <br /> <br />. , <br /> <br />. I <br /> <br />r, <br /> <br />, . <br /> <br />.. , <br /> <br />D. Quality & Safety <br /> <br />The primary goal of every construction project is to end up with a high-quality product <br />while staying within budget and on schedule. The <br />CES team has the depth and breadth to provide <br />the full range of required in-house construction <br />consulting expertise to keep projects on track <br />from inception through post-construction <br />activities. Through all phases of a project, <br />communication, strategic planning, cost <br />estimating, scheduling, document management, <br />and state-of-the-art technology will be used to <br />effectively determine and regulate how the City <br />of Sunny Isles Beach's time and funding are used <br />and to ensure a successful build-out. <br /> <br /> <br />We understand the need for and are prepared to provide resources with diverse <br />professional backgrounds in architecture, engineering, general contracting, and <br />construction management and inspection as required. Our seasoned professionals <br />provide the broad perspective and experience to anticipate and avoid unnecessary <br />setbacks throughout the life of a project. <br /> <br />To meet the contract demands of the City of Sunny Isles Beach, we have put together <br />a dynamic team of technical and support staff to ensure that completion of the <br />projects is a success. The composition of the team is critical, particularly when <br />addressing the many obstacles that are likely to arise during the course of construction. <br />The CES Team's staff is comprised of individuals seasoned in many disciplines, sharing <br />common goals of innovation and quality of work. Once awarded the project, to <br />increase our understanding of key project issues, milestone, and possible constraints, our <br />first course of action will be to meet with the City of Sunny Isles Beach, to clearly identify <br />the short and long-term goals, and to establish an open line of communication with all <br />stakeholders. The CES team is ready to report to work immediately on the City of Sunny <br />Isles Beach projects. <br /> <br />To add value to the services provided, CES requires new hires to complete a training <br />program that includes a course on contract specifications and inspection requirements. <br />These requirements include training in the following areas: Standard Specifications, daily <br />reports, pay estimates, testing procedures, material quantities and tracking procedures, <br />materials, timesheet completion, coordination procedures and as-builds. Additionally, <br />CES provides the following safety training for our employees and assists our staff in <br />keeping their certifications current. <br /> <br />Our team has extensive experience maintaining cost engineering and cost estimating <br />initiatives for projects from conceptual design to the project close out. Members of our <br />team all have the latest electronic copies of Means guides, and have an in depth <br />understanding of contracting methods and unit prices in the State of Florida. <br /> <br />City of Sunny Isles Beach Continuing Professional Architectural & Engineering Services RFQ 12-04-02 I 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.