<br />Approach and methodology (cont.) <br /> <br />) <br /> <br />We have developed a Work and Quality Control Plan with 4 basic tasks in order to <br />meet the 5 goals above: <br /> <br />Task 1 - Program, Project Inventory, Preliminary Services <br />During this task we will establish or verify the project program, which will be <br />used to continue and complete the design. Some of the critical criteria include: <br /> <br />1. Client and User needs/scope <br />2. Budget/Cost Control with CM Contractor <br />3. Existing Building As-built Information <br />4. Surveys and Utility Detection <br />5. Design Guidelines <br />6. Delivery schedule for each design phase and construction <br />7. Phasing <br />8. Operational Analysis <br />9. Material Analysis based on type of project <br />10. LEED "Green Design <br /> <br />) <br /> <br />All of the available criteria and guidelines, which have been established by the <br />client will be the basis of the Team's initial approach to the project. Task I will <br />establish data, controls, conditions, preliminary procedures and information to <br />support further development in design. Task 1 efforts will begin immediately upon <br />Notice to Proceed and may overlap other phases of work as required to complete <br />individual tasks. <br /> <br />Task 2 Design and Construction Documents <br />The LMP Design Team will closely coordinate the Design and Construction <br />Documents with client, users, Contractor and other specialty consultants as <br />required. The Design Team will have scheduled coordination meetings to ensure <br />that the following criteria are always addressed and properly implemented on the <br />Design and Construction Documents: <br /> <br />1. Incorporate established program requirements <br />2. Incorporate any previous comments from client or other agencies <br />3. Consultant coordination meetings <br />4. Develop quality specification <br />5. Develop quality details <br />6. TenantlUser coordination <br />7. Phasing of Project <br />8. Coordination with other public/governmental agencies <br />9. Confirm Budget/Cost Control with Contractor <br />10. Confirm schedules for Design and Construction with Contractor <br />11. Pre-Permitting (dry runs) and final permitting <br /> <br />LAURA M. PEREZ AND ASSOCIATES, INC <br /> <br />RFQ #]2-04-02 <br /> <br />PAGE 64 <br />