My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01025 <br /> MEASUREMENT FOR PAYMENT <br /> PART 1 -GENERAL <br /> 1.01 SCOPE <br /> A. Payment for the various items of the Schedule of Prices, as further specified herein, <br /> shall include all compensation to be received by the Contractor for fumishing all tools, <br /> equipment, supplies, and manufactured articles, labor, operations, permit fees, licenses, <br /> taxes, insurances, bonds, overhead and retrofit, and incidental appurtenant to the items of <br /> work being described, as necessary to complete the various items of the work all in <br /> accordance with the requirements of the Contract Documents including all appurtenances <br /> thereto, and including all costs of compliance with the regulations of public agencies having <br /> jurisdiction, including Safety and Health Administration of the U.S. Department of Labor <br /> (OSHA). No separate payment will be made for any item that is not specifically set forth in <br /> the Schedule of Prices, and all costs therefore shall be included in the prices named in the <br /> Schedule for the various appurtenant items of work. <br /> 1.02 SCHEDULE OF VALUES <br /> A. Submit schedule on Owner's Standard form, as outlined in Section 01152 - <br /> Applications for Payment. <br /> B. Reference paragraphs 2.6, 2.8 and 14.1 of Section 00700-General Conditions. <br /> 1.03 LUMP SUM <br /> A. Unless otherwise stated, payment for lump sum items will be based upon the <br /> completion of the entire lump sum item, complete in place, all in accordance with the <br /> requirements of the Contract Documents. <br /> 1.04 PAYMENT AND PERFORMANCE BOND <br /> A. Payment of performance bond and payment bond and for consideration for <br /> indemnification of Owner and Engineer as stated under the General Conditions and <br /> Supplementary Conditions shall be included in the Grand Total Bid. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3- EXECUTION (Not Used) <br /> END OF SECTION <br /> 08/12 01025-1 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.