Laserfiche WebLink
• <br /> B. The Contractor shall be responsible for changing the oil in all drives and <br /> intermediate drives of each mechanical equipment after initial break-in of the <br /> equipment, which in no event shall be any longer than three weeks of operation. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3- EXECUTION (Not Used) <br /> END OF SECTION <br /> 08/12 01600-7 11-4179 <br />