Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />14  <br />01C032018D  <br />  <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  <br />(Complete one Section E for each key person.)  <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  <br />David Swigler, PE   Coastal Engineer a. Total 9  b. With Current Firm 9  <br />15. FIRM NAME AND LOCATION (City and State)  <br />Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  <br />MS /2009/Ocean Engineering   <br />BS/2006/Civil Engineering  <br />Professional Engineer, Civil, License No. 75548, Florida  <br />Professional Engineer, Civil, License No. 33742‐E, Alabama  <br />Professional Engineer, Civil, License No. 114850, Louisiana  <br />Professional Engineer, Civil, License No. 38454, Texas  <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  <br />Mr. Swigler has worked on a variety of beach nourishment, marsh creation, dredging, shoreline stabilization, and marine  <br />structure projects in the Gulf States, along the eastern seaboard, and throughout Florida. He has experience throughout  <br />the various stages of the project planning and implementation process including feasibility studies, engineering and  <br />design, permitting, coordination with regulatory agency, budgeting, construction administration, and performance  <br />monitoring. This diverse experience is the foundation for Mr. Swigler’s ability to administer, oversee, and manage  <br />coastal restoration programs from inception through to construction.  <br />19. RELEVANT PROJECTS  <br />a.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Indian River County Beach Preservation Plan   <br />Indian River County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2015    <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Project manager for the 2015 update to the County’s Beach Preservation Plan. The update assessed the condition of  <br />its coastline, performance of prior management activities, and the continued use of beach nourishment vs.  <br />implementation of coastal structures as future management strategies. Numerical modeling evaluated project  <br />performance. A storm impact analysis coupled with GIS quantified reduction in property damages due to coastal  <br />management. A recreational benefits analysis assigned an economic value to the beaches. Design, permitting,  <br />construction, and monitoring costs were optimized to develop long term, cost effective management strategies for  <br />the next 30 years. Mr. Swigler was responsible for managing the study, performing engineering analyzes, developing  <br />the Plan, administering public meetings, and presenting to the beach advisory committee and Board of County  <br />Commissioners.  <br />b.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Indian River County  <br />Sector 3 Dune Repair Project, Indian River County, Florida   <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2012‐2014  2013‐2014  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Project manager and engineer of record for the Sector 3 Dune Repair. The project, constructed the winter of  <br />2013/2014, repaired the initial Sector 3 project that sustained damages from Hurricane Sandy in 2012. The dune  <br />repair project involved truck‐hauling and placing 175,000 CY of sand from an upland source along ~6 miles of  <br />coastline. The dune was vegetated with 189,000 native plants. Mr. Swigler was responsible for the design,  <br />permitting, and construction of the project. This involved quantifying storm losses, designing fill templates,  <br />coordinating with state and federal permitting agencies, developing construction plans and specifications, assisting  <br />with bid solicitation, managing construction.  <br />