Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />39  <br />01C032018D  <br />  <br />  <br />Coquina Beach (2015).  <br />APTIM provided geotechnical services to identify the sand source, the engineering services, State and FEMA funding  <br />acquisition assistance, permitting services, extensive environmental services, technical consultation and construction  <br />oversight services to help restore this portion of the island’s receding coastline.  <br />APTIM also developed and acquired permits for a seven‐mile‐long underwater pipeline corridor which allowed the  <br />dredging contractor to use the same equipment to deliver sand to both ends of the island. The use of an underwater  <br />pipeline to place sand in Coquina Beach avoided pipeline placement on the beach over almost the entire length of Anna  <br />Maria Island.  <br />APTIM also designed and constructed an approximate 5‐acre mitigative artificial reef approximately 1,100 feet off the  <br />coast of Coquina Beach. APTIM staff worked aggressively on the County's behalf to limit the amount of required artificial  <br />reef as replacement for burial of nearshore hardbottom by the beach nourishment project, again saving Manatee County  <br />construction funds.  <br />OTHER NOTABLE EFFORTS FOR THE COUNTY:  <br />• Federal Coordination and Funding in the City of Anna Maria Island  <br />APTIM assisted Manatee County with proceeding under the authority of Section 206 as the non‐federal sponsor of  <br />construct the federally authorized Central Beach nourishment project. Section 206 allowed Manatee County to engineer  <br />and construct the project, control the design and schedule and reduce engineering and construction costs. APTIM  <br />adapted the construction project to include a 0.6‐mile coastal segment in the City of Anna Maria, which is not part of the  <br />Federal project.   <br />• Emergency Response  <br />We have assisted the Manatee County in securing funds and construction assistance for multiple storm repair projects:  <br />2005 and 2011 projects in response to hurricane activity in 2004 (H. Charlie/Ivan), 2014 project in response to T.S.  <br />Debby, and currently working with the County to obtain FEMA funding associated with the storm damages from  <br />Hurricane Hermine and Hurricane Irma.  <br />• Coastal Structure Removal & Replacement  <br />APTIM is assisting the County with the Cortez Groins Removal and Replacement project, which includes the demolition of  <br />three dilapidated pier‐type structures and replacement with new permeable adjustable groins in order maintain the  <br />stabilization of the shoreline that fronts the island’s evacuation route.  <br />25. FIRMS INVOLVED IN THIS PROJECT  <br />a.  <br />(1) Firm Name (2) Firm Location (City and State)  Role  <br />APTIM  Boca Raton, FL  Primary consultant