Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />41  <br />01C032018D  <br />  <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  <br />THIS CONTRACT  <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  <br />20. EXAMPLE PROJECT  <br />KEY NUMBER  <br />4  <br />21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  <br />City of Deerfield Beach – Coastal and Waterway Program   <br />City of Deerfield Beach, Florida  <br />PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  <br />2005‐ongoing  Various  <br />23. PROJECT OWNER’S INFORMATION  <br />a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  <br />City of Deerfield Beach  Patrick Bardes   <br />Coastal & Waterway Coordinator  <br />954‐480‐1426  <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  <br />Project Descriptions:  <br />APTIM has provided various coastal and marine engineering services for the City of Deerfield Beach since 2005 and is  <br />currently assisting the City with the development and implementation of their coastal and waterway program. The City’s  <br />waterfront presents many unique challenges, which require attention during design and permitting to avoid impacts to  <br />the environment while maintaining project intent and benefit. The following provides summaries of current and previous  <br />projects APTIM is implementing or has completed for the City.  <br /> Storm Berm Nourishment Project  <br />Since 2016, our team of coastal engineers has been involved with the preliminary design and permitting of a storm berm  <br />nourishment project for the City. The project included topographic beach surveys along the entire City shoreline to  <br />support the preliminary design, which included a varying design template to restore the dune and beach berm. Sand  <br />samples were collected and analyzed by our in‐house geologists. A Coastal Construction Control Line permit was  <br />prepared and submitted to the FDEP. The final permit was recently issued and provides the City with a proactive  <br />mechanism to nourish their shoreline before or after a storm.  <br /> Hurricane Irma Pier Repair  <br />APTIM performed a structural engineering assessment of the  <br />International Fishing Pier to evaluate damage sustained during  <br />Hurricane Irma. The assessment included both above and  <br />underwater data collection, which was used to provide  <br />recommendations for repair design. APTIM provided structural  <br />engineering design for the repair of the structure. The project is  <br />currently under construction and APTIM is providing construction  <br />administration services.  <br /> Artificial Reef Project  <br />APTIM is currently engaged by the City to design and permit the  <br />construction of a recreational artificial reef in the nearshore of the City offshore of SE 2nd Street. The project is based on  <br />the Artificial Reef Feasibility Study we completed in 2010. The project is partially funded with grants from Florida Sea  <br />Grant. APTIM completed a materials assessment of the existing boulder stockpile in Tivoli Park, completed a stability  <br />analysis to optimize the design, and prepared permit applications for Broward County, FDEP, and the U.S. Army Corps of  <br />Engineers. The project is currently in permitting with construction expected in late 2018.  <br />  <br />APTIM performed a topside assessment of hurricane  <br />damage