Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />42  <br />01C032018D  <br />  <br /> Vessel Exclusion Zone  <br />APTIM is providing coastal engineering and permitting services for  <br />a vessel exclusion zone. Services include coordination with the  <br />FDEP and USACE to permit a series of buoys along the City  <br />shoreline to create a safe area for public swimming and  <br />snorkeling. The project is ongoing but will include sediment  <br />probes to determine buoy foundation requirements, engineering  <br />design, and preparation of plans and specifications. Construction  <br />is expected to begin in late 2018.  <br /> FEMA Coordination Project  <br />The effects of Hurricane Matthew passing off the coast of Florida  <br />resulted in beach erosion along the City’s shoreline. APTIM  <br />completed a post‐Hurricane Matthew storm damage assessment  <br />using City provided topographic beach profile data. Volume losses  <br />were calculated and documentation was submitted to FEMA.  <br />APTIM obtained a fully executed Project Worksheet (PW) for  <br />future project reimbursement.  <br /> 2008/2009 Dune Restoration Projects  <br />APTIM designed, permitted, and oversaw construction activities of  <br />2 beach nourishment projects in the City. The 2008 and 2009  <br />projects were constructed to address erosion that occurred  <br />during the 2007 tropical storm season. The projects both qualified  <br />for FEMA funding for restoration and placed 5,100 and 7,300  <br />cubic yards of upland sand, respectively, to restore the eroded  <br />beach. The projects were permitted by the FDEP under the CCCL  <br />program, which restricted the fill placement to above the mean  <br />high water line.  <br /> Deerfield Canals Hydrographic Survey  <br />APTIM conducted a hydrographic survey of approximately 3.5  <br />linear miles of 16 canals in the City of Deerfield Beach in 2005.  <br />Approximately five longitudinal transects were surveyed through  <br />each of the 16 canals and depths were collected at approximately  <br />5‐foot intervals. The data was analyzed and presented to the City,  <br />which allowed the City to avoid maintenance dredging and  <br />significant capital expenditure.  <br />  <br />25. FIRMS INVOLVED IN THIS PROJECT  <br />a.  <br />(1) Firm Name (2) Firm Location (City and State)  Role  <br />APTIM  Boca Raton, FL  Primary consultant  <br />   <br />The 2008/2009 projects were truck‐haul nourishments  <br />and utilized a conveyor system due to limited beach  <br />access  <br />APTIM personnel performing hydrographic survey in the  <br />City of Deerfield Beach canal system  <br />APTIM performed a boulder stockpile assessment in Tivoli  <br />Park  <br />Post‐storm damage assessment