My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lukes Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-02) Parks and Recreational Facilities Landscape Maintenance Services
>
Responses
>
Lukes Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 12:19:53 PM
Creation date
4/26/2018 11:32:39 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks and Recreational Facilities Landscape Maintenance Serv
Bid No. (xx-xx-xx)
18-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
". ,r <br />01 S11N 0 <br />irrigation maintenance, etc. will occur. The HcP must also refleR a MuMget estimate ror eacr <br />month. <br />The Initial HEP must be submitted wiuiln ioulrm-n (1`►) (lays or execution or tree ContraET. Each <br />sobsequem HEP must Me suGmlued one moniM prior to tRe star' or the new ContraC[ year. Any <br />i cvlsions to the HEP must Me su-UjeR to the prior wriuen acceptance or the ProjeET Manager. <br />vvitRin rour'een t1zT) Mays or the execution or tRe Contract the Contractor must submit a duality <br />Control Plan CgCP to the ProjeLT Manager(s) ror review and a%--,,tance. The rationale <br />underpinning ire tjCP Is that the Contractor is responsible for duality Control. All methods, <br />procedures, ant] rorms must support this rationale. The qCP must claarly identity how the <br />Contractor will monitor its own Wcrk to ensure that the Work 6 performed and meets the <br />Performance Standards Z.3toblished In the Contract. The qCP must provide for the inspection and <br />assessment of the quality and progress of the Work at tach Site where Work is being performed. <br />11hc QCP must be designed to kz=p the Contractor's management and the City informed of all <br />135ues affecting quality, to include timely and effective corrective action for all deficiencies. These <br />inspections must bl in addition to the requirement fv-r dally supervision. The QCP records must, <br />In part, consist of checklists of inspections and must indicate the nature, frequency and number of <br />observations made, number and type of deficiencies found, and the nature of correMve aMon <br />taken as apprpriate. At a minimum the QCP mast address the following: <br />■ An inspection system that is tailored to the different i asks and zites covered unt]er tree <br />Performance Standards and Technical Specifications,• <br />• A ,ystem for Identifying and correRing deficiencies In we quality or we vvorR Qerore tine <br />level of performance becomes unacceptable analor we ProjeLT Managertst or Consultant <br />Independently Identify the deficiencies' <br />• H system to ensure that the ConuaLTor's empioyees are notified or t]enciencies, tnat tree <br />noted deficiencies are correued lir possiMlet_ ant] mat tRe employees are <br />counseleaTretraineM as necessary to ensure mat t]enciencies do not recap <br />• A system tial provides tree Projec[ Manager�s) access to all Contractor documentation, <br />repuMS, and riles -kto Include any rorms on wnicn qual.ry control Inspections are <br />aocumen[eM) wltn respeU to ContraETor quality controi inspections and any ��rrective <br />aMon taKen• <br />■ it the Contram, Has a co,, p.ratelhome office, how it will provide Contract support, <br />services and controls• and <br />■ i ne identity or all personnel who will be performing quality control inspections by name <br />and title, and verification that the person who actually performed the Work must not <br />perform juality control in5pcctions. <br />where the qCP Is returned by the Project Manager for revi3ions or corrections, the Contractor must <br />re3ubmit the qCP within seven (7) days of receipt from the Project Manager(s), with requezted <br />revisions or corrections. The Contractor must not Implement any change, to its approved QCP <br />prior to review and acceptance by the Project Manager(s). <br />City of Sunny Isles Beach I ITB 18-03-02 Parks and Recreational Facilides Landscape Maintenance Services <br />Lukes' La,.a3caping, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.