My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CERES
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-02 Disaster Debris Management and Removal Services
>
Responses
>
CERES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 1:57:44 PM
Creation date
5/10/2018 3:33:08 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Disaster Debris Management
Bid No. (xx-xx-xx)
18-04-02
Project Type (Bid, RFP, RFQ)
RFP
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> beginning of the day each field employee will sign in a daily time sheet, the location according to zone (if <br /> the zone changes during the course of the day the employee will document the new location), the phase of • <br /> work he/she is performing, and the unit number and beginning hours of the piece of equipment that he/she <br /> is operating(if applicable). The employee responsible for loading trucks and truck drivers will keep a running <br /> tally of the loads they complete from each particular zone over the course of the day. It is then the <br /> responsibility of the field employee to perform an inspection of the piece of equipment and inform the crew <br /> Foreman so corrective actions may be taken. The inspection will be documented on a punch-list that is <br /> supplied on the employee's daily report. After inspections and documentation are complete,, the crew will <br /> begin removing the debris from their zone assigned. <br /> Two flagmen will be placed on each end of the work perimeter to meter the flow of traffic into the work <br /> perimeter. If debris is to be moved across the roadway, the flagmen will stop all traffic. When the loading of <br /> a truck is completed, the flagmen will also stop traffic while the truck moves out of the controlled area. <br /> During the work, the flagmen will be equipped with two-way radios to coordinate the direction of traffic. <br /> Additional trucks staged for loading will all be stationed to the side of the roadway from which they will be <br /> loaded so they will not obstruct incoming traffic to the work perimeter. When loading is completed, the truck <br /> will leave the work area. <br /> The trucks will be placed in single file to the rear of the % ¢P <br /> Knuckleboom loader. As each truck in the queue is K. /k :r''1 ,,.,: <br /> loaded and departs for the dump-site, the next truck in rt}� i . a <br /> line backs up to the loading perimeter. The M.:H r ' ,-. / - <br /> Knuckleboom loader will load from piles that are staged �,,,��[[.2 `� „p.,¢ 'p"t•t y1' yw-• • `• i'; ` - <br /> by two front-end loaders working ahead of the ;'«� �y > � N a sx;p t,,:f0",...► <br /> Knuckleboom loader to limit the amount of movement ': 't % 4 4'n <br /> of the Knuckleboom loader during the course of theiti <br /> «� ', , i �I= f t ,! oi.J „ <br /> day. When self-loading trucks (self-loaders)are in use £�, v i 11 Ei , , # i '�'' <br /> 4 <br /> „tii <br /> those trucks will be directed to an appropriate locations' "�bYi' ` `N' :C 1; I. a€ F <br /> within the work perimeter where they can begin loading `_ --— ' � � �` -- — <br /> immediately. . -% t 'sl ` � , <br /> The front-end loaders will stage the material from the -. _" x „ ,, ,� 4pWP.::, <br /> ' k K.. <br /> area between the sidewalks and the street into staging '' -:' '• ' • "-'~ <br /> areas on the side of the street. If the crew is working in a high traffic area then this method will not be <br /> incorporated—rather the staging will be done completely on one side then staged completely on the other <br /> side.When the Knuckleboom loader encounters material difficult to handle(such as chunk wood),the Front- <br /> end loader will assist in performing the loading. <br /> Two laborers trained in the use of chain saws will assist the Knuckleboom loader. They will rake and clean <br /> up the area of the pile. When oversized material is encountered, the laborers will use chainsaws to reduce <br /> its size. The laborers will also assist the truck operators in staging for the Knuckleboom loader, notifying <br /> when loading is completed and for obstructions to and from the loading area. <br /> The crew Foreman will be responsible for scouting future debris removal locations. He will utilize maps to <br /> locate the perimeter of the zone to which he is assigned. While scouting the zone, the Foreman's <br /> responsibilities will include: <br /> • Locating logical truck routes. <br /> • Plotting a logical and efficient direction for the crew. <br /> • Locating and planning for hazards within the zone (such as high traffic areas). <br /> • Notifying his Supervisor and Sector or Area Manager of hazards in a timely fashion so the hazard <br /> can be avoided if possible or mitigated if necessary. <br /> • Identify plan for and obtain the necessary resources for a steady workflow in future locations of the <br /> work zone. <br /> At the end of each shift, crew employees will complete their time sheet by entering in the time the shift <br /> ended, the ending hours on the equipment they utilized and the number of loads they either hauled or <br /> loaded. They will deliver this timesheet to the Foreman before leaving the shift. The Foreman will compile <br /> II <br /> the labor information to a daily worksheet,, along with Purchase Orders, trucking that was utilized and <br /> Tab 8 Project Understanding and Technical Approach <br /> ENENVIRONMENTAL Section 1 Debris Management Operations Plan <br /> Page 8-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.