City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> 0 number of loads hauled, equipment utilization, and a briefing of the course of the day describing any <br /> problems that arose and solutions implemented, and areas worked. The Foreman will then turn in the <br /> reports for the day. The following topics will be discussed with the management team: <br /> • Changes in time for completion <br /> ▪ Changes in cost objectives for the project <br /> • Changes in operating policy <br /> • Changes in the technical specifications for the projects <br /> • Changes in methods <br /> • Changes in needs <br /> • Revised activity plan estimates <br /> ▪ Failure of suppliers or contractors to deliver on time <br /> • Reassessment of resource requirements on individual activities <br /> • Inability to utilize resources as planned <br /> • Unexpected technical difficulties <br /> • Unexpected environmental conditions <br /> • Scheduling needs <br /> • Performance of work per zone or region <br /> • Unplanned costs <br /> • Any problems or future problems pertaining to the project <br /> After the meeting is adjourned, the Project Manager (PM) will collect all the data. The next business day <br /> the data received and the daily reports will be entered into a computerized database. These reports will be <br /> evaluated by the Disaster Response Business Unit Director and discussed with the CEO and the PM. The <br /> data will be used in weekly reports that itemize costs per region and code and weigh them towards the <br /> projected costs and schedules of the project. These reports will be submitted weekly to corresponding <br /> i <br /> company divisions along with reports submitted to the City. It will be the responsibility of the PM to utilize <br /> i the minutes of the daily meeting and the information from the reports to make daily assessments of the <br /> schedules of each individual crew. The PM will also have daily meetings with the City regarding <br /> performance and schedule issues of the project. This meeting will cover the customer needs of each zone, <br /> projected costs and scheduling of assigned zones, priority of zones, and work to be completed. <br /> Geographic Area Management <br /> Every area has its own unique geographic characteristics that define the parameters of the response. An <br /> urban area, smaller municipalities, and rural areas offers different challenges to the successful completion <br /> of a disaster recovery mission. Traffic is always an issue that must to be addressed especially when working <br /> in and around waterways. Bridges are natural bottlenecks, and our experience has taught us, the less they <br /> are used during the transportation of the debris, the better. Ceres is always aware that our disaster recovery <br /> work is not the only thing utilizing the transportation system. Through the selection of strategically located <br /> DMS, our haul trucks should have minimal impact on these areas, as the haul zones are designed to keep <br /> the trucks working close to each DMS. In the successful completion of our Hurricane Katrina disaster <br /> recovery operation in Louisiana, we worked with all of these geographical characteristics and traffic never <br /> became an issue because the zone design and DMS locations worked together as intended. All impact <br /> sensitive areas, such as waterways, parks, forest land, and reserves will be dealt with in an environmentally <br /> appropriate manner. <br /> Debris Management Sites (DMS) <br /> Ceres will utilize the DMS identified by the City. In the event that additional sites are required, Ceres will <br /> work closely with the City to secure leasing agreements and permitting for additional facilities. The state or <br /> local environmental authority would be notified and the required information submitted by Ceres. <br /> Ceres will provide sufficient equipment and personnel to process, by burning (if allowable) or grinding, a <br /> minimum of 210 and up to 500 cubic yards of debris per hour per crew. Each DMS would generally include <br /> the following equipment: • <br /> 41) • One Grinder, either horizontal or tub (depending upon needs/specs), and/or Air Curtain Incinerator <br /> • Two Backhoes with grapples <br /> r,1-1 l. <br /> ENVIRONMENTAL Tab 8 Project Understanding and Technical Approach <br /> Section 1 Debris Management Operations Plan <br /> Page 8-11 <br />