City of Sunny Isles Beach
<br /> RFP 18-04-02 Disaster Debris Management and Disposal Services
<br /> o One Wheel Loader with rake
<br /> o One Wheel Loader with a light materials bucket for loading mulch
<br /> o One Maintenance Truck _ l,
<br /> • One Water Truck [During work for the USACE in Louisiana after
<br /> One Road Grader(optional) Hurricane Katrina,we performed debris removal
<br /> o One Inspection Tower l operations in 11 Parishes, and operated 54 1
<br /> • One Hazardous Materials Containment Area IDMS/final disposal sites,simultaneously_
<br /> o One Foreman with cell phone
<br /> ▪ Four walking floor trucks (120cubic yards) for hauling mulch
<br /> o Additional Equipment as determined by the Contract and Site Manager
<br /> One operator will be assigned site maintenance duties and will operate the Motor Grader,Water Truck, and
<br /> Low-bed Trailer.This operator's primary duty is to ensure use of the roads by the dump trucks, and maintain
<br /> dust and fire control. The Loader with blade will have intermittent general site maintenance duties and will
<br /> keep areas around the burn pits, ash storage, and grinding areas clean.
<br /> Ceres will construct a hazardous materials containment area at each DMS measuring approximately 30' x
<br /> 30'. Typically, the perimeter will be lined with hay bales and staked in place. The area will be lined with
<br /> heavy gauge plastic (10 mil or greater) to provide a waterproof barrier. A plastic cover (10 mil or greater)
<br /> will be used to prevent rain from entering the containment area. Site run-off is redirected away from the
<br /> containment area by site grading. Hazardous materials that are encountered during clean up operations
<br /> will be staged in this area. Such materials will be properly disposed of in a timely manner.
<br /> Inspection
<br /> DMSs will be the point of �" ,#tege d • w " `
<br /> i, Modular ins ection.and k-• ` 00 Obaervatontower '-
<br /> inspection and load 1.- Observation Tower • '.:10, Inc niin2g loaded,uck, ' * rte
<br /> e' -- J 402 Segregated metalTdetiris' ' '
<br /> volume estimation by the _.- ---- ,0 G��e,artlbed to reduce effect of mud
<br /> 106 One-way road
<br /> City or their designated 106 To a attendantwith.personalpotectve equipment `
<br /> '027-3.,„,..L1.,,,4 Yt2 Outbound empty truck ':J,1,
<br /> representative. Inspection .,,,,....t- a:. & 1. - ' 0
<br /> towers will be used to ''` m =- `-
<br /> observe and record all t:: .:V- �� � '''''''''':-.:=:',4;-
<br /> ti -�= o -
<br /> y�+x.`.r,,, e Y s' arP�� �.9. � 5- .='.r:...., ���,•'4'�u � ,
<br /> trucks entering ands 1
<br /> leaving the DMS and ---g ,„,,,,,„,L,„..„, tot .
<br /> document their loads. The ;fi : "
<br /> tower will be 10 feet above �k!"`�~ - .. ,` :
<br /> the existing ground '4 ..t .11:::1 ,F; —E. .t;s
<br /> elevation, with a wooden i # =l� t
<br /> handrail and steps tor4 � '`; .,
<br /> provide access and . � .'i� EXIT �' �r .:t ��r�- '-,
<br /> constructed of pressure � rr (,F � ,.,'�"„ r ; � " ger Y '
<br /> treated lumber. The floor ` � i
<br /> area will be 8'x8' ? f " u :,. _ � j, � �'� . rEa a_=
<br /> constructed of 2'x8'joists,
<br /> 16" O.C. with 3/" plywood supported by four 6"x6" posts. The perimeter of the floor area will be protected
<br /> by a 4' high wall constructed of 2'x4" studs and 3/" plywood. The entire floor area will be covered with a
<br /> corrugated tin roof. The roof will provide minimum 6'6" headroom below the support beams.The inspection
<br /> tower will be large enough to adequately accommodate a minimum of three people simultaneously.
<br /> City Monitors/Inspectors will inspect each load to verify that:
<br /> • The truck has been pre-approved and measured.
<br /> • The load is eligible.
<br /> • The `percentage filled to' figure is determined and noted on each individual load ticket.
<br /> •
<br /> The Monitor will determine the capacity of the truck and estimated load volume (percent capacity), and
<br /> evaluate the load for contaminants requiring segregation. The Monitor will instruct the driver regarding the
<br /> sem.
<br /> appropriate dump location at the site and will verify the truck is completely empty following dumping. The
<br /> Monitor will complete the load ticket presented for each load delivered to the site.
<br /> CErl.l Tab 8 Project Understanding and Technical Approach
<br /> EN
<br /> �V I R O�N M1.lE N T A L Section 1 Debris Management Operations Plan
<br /> Page 8-12