City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> f Time elapsed from Notice to Proceed to complete mobilization: 100% in 24 hours <br /> Expected Management and Supervision Staff: 1 project manager, 1 superintendent, 1 foreman, 1 project <br /> accountant <br /> Methodology for Scheduling and Routing the Removal of Debris: Ceres would provide two or three <br /> crews consisting of self loading knuckleboom trucks with flaggers and chain saw operators. Bobcat type <br /> loaders would likely be used to forward <br /> material into larger piles for efficient pickup Smithfield,VA <br /> by self loading knuckleboom trucks. Each 26,330CY Hauled <br /> crew would be supervised by a lead man, ,,,,,, , 71 Days <br /> and all crews would be supervised by a 2500 <br /> superintendent who would interface with the , <br /> zoo,* <br /> City field representative. A Debris <br /> Management Site (DMS) will be established, i!..00 <br /> a Ceres site manager will be installed who 1O°° r —" <br /> will manage the site operations, which would S4O <br /> likely include a dozer, an excavator with O <br /> �� 8� 8iN 8., 8p �� 8.l 8p 8� 8� ..1.#••, <br /> grapple, a tub grinder or air curtain `o\•S `o<eN ..t.,‘zlo`�,r`or0 s> ..,%\s' <br /> ``\�,p,,\.sc•P �0 `��>�,,\�.4\ <br /> incinerator and dump trucks to haul out <br /> reduced debris(ash or wood chips). A Ceres --� <br /> project manager would supervise the superintendent and DMS site manager, and will supervise site . <br /> restoration. The Ceres project manager will also interface with the City administrators to assist with FEMA <br /> reimbursement including writing the Project Worksheet. Ceres' expert FEMA reimbursement staff would be <br /> available to assist further with FEMA reimbursement issues. <br /> Ceres will haul the debris to a TDSR site where it will be reduced by grinding and then transferred by "live <br /> floor"or"walking floor" trucks with approximately 90 cubic yard capacity to a recycling yard for grinding and <br /> conversion to mulch for recycling, or other method acceptable to the City. <br /> Administration: All trucks would be placarded and certified by Ceres and City personnel, and each load <br /> ,' would be ticketed by a City-authorized monitor. All loads will pass under an inspection tower and will be <br /> "scaled" or"called" by a City-authorized monitor and the load call will be recorded on the load ticket. <br /> Ceres will use its proprietary load ticket software that has been successfully used for twelve years on FEMA- <br /> reimbursed projects. Daily reports will be issued by Ceres stating the amounts of debris hauled the types <br /> of debris, and the zones from which the debris originated. Additional information will be provided by Ceres <br /> as requested by the City. Ceres, with the City's prior approval, will make available updates to citizens <br /> through internet access, including information on which areas have been cleared, and the proposed <br /> schedule for future clearing of debris. <br /> Event Type: 3 <br /> Significant Event– Removal, Reduction, Hauling –Woody Debris Only–Widespread or City-wide <br /> Ceres Headquarters Office Location: Sarasota, Florida permanent office with mobile Sunny Isles Beach <br /> office <br /> Number of TDSR Sites: 2 or 3 <br /> Location of TDSR Sites: To be determined <br /> Size of TDSR Sites: 5 to 15 acres <br /> Type of Hauling Equipment: Self loading knuckleboom trucks, dump trucks/trailers, other <br /> Total Expected Cubic Yards of Debris: up to 400,000 CY <br /> Quantity of Hauling Equipment: Self loading knuckleboom trucks, dump trucks/trailers, approximately 8 <br /> crews with approximately 46 trucks total. <br /> Time elapsed from Notice to Proceed to first arrival onsite of equipment: 1 hour <br /> Time elapsed from Notice to Proceed to complete mobilization: 50% in 24 hours, 100% in 48 hours <br /> Expected Management and Supervision Staff: General Management: 1 project manager, 1 site <br /> superintendent, 1 project superintendent, 2 foremen, 1 quality control officer, 1 administrator, 1 clerk, 1 <br /> subcontracting officer, 1 safety and health officer; plus Expected Personnel per TDSR Site: 1 TDSR Site <br /> Manager, 1 foreman with truck and cell phone, 1 assistant foreman, 5 to 8 heavy equipment operators, 2 <br /> F. to 4 flaggers for traffic control, 1 to 5 additional laborers for segregation and other material handling <br /> rE .ENVIRONMENTALTab 8 Project Understanding and Technical Approach <br /> Section 1 Debris Management Operations Plan <br /> Page 8-21 <br />