Laserfiche WebLink
City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> • <br /> • <br /> Methodology for Scheduling and Routing the Removal of Debris: Ceres would provide several crews <br /> consisting of trucks, loaders, chain saw operators, and flaggers. Trucks and loading equipment would be <br /> West Palm Beach, Fl provided with each crew, including self- <br /> 405,200 CY Hauled loading knuckleboom trucks and other <br /> 114 Days loading and hauling equipment. Bobcat <br /> I.000 - —- - - _-�� -- - - - " " type loaders would likely be used to <br /> ,,)00 00 forward material into larger piles for <br /> I <br /> efficient pickup by self loading <br /> knuckleboom trucks. Each crew would <br /> be supervised by a lead man, and each <br /> crew would be supervised by a foreman <br /> who would report to the Ceres <br /> superintendent who would interface <br /> with the City field representative. A <br /> Ceres site manager will be installed <br /> __. _ _. ._ _.__.___ _ _._ _: '_._. .._ who will manage the TDSR site <br /> 9,9”00+ ,ororrooa II zoo. izrairrnye <br /> operations, which would likely include a <br /> tub grinder or air curtain incinerator, a dozer, an excavator with grapple and dump trucks to load out. A <br /> Ceres project manager would supervise the superintendent and DMS site manager, and will supervise site <br /> restoration. The Ceres project manager will also interface with the City administrators to assist with FEMA <br /> reimbursement including writing the Project Worksheet. Ceres' expert FEMA reimbursement staff would be <br /> available to assist further with FEMA reimbursement issues. <br /> Administration: All trucks would be placarded and certified by Ceres and City personnel, and each load <br /> would be ticketed by a City-authorized monitor. All loads will pass under an inspection tower and will be <br /> "scaled" or"called" by a City-authorized monitor and the load call will be recorded on the load ticket. Ceres <br /> will use its proprietary load ticket software that has been successfully used for twelve years on FEMA- <br /> reimbursed projects. <br /> Daily reports will be issued by Ceres stating the amounts of debris hauled, the types of debris, and the • <br /> zones from which the debris originated. Additional information will be provided by Ceres as requested by <br /> the City. Ceres, with the prior approval of the City, will make available updates to citizens through internet <br /> access, including information on which areas have been cleared, and the proposed schedule for future <br /> clearing of debris. <br /> Event Type: 4 <br /> Significant Event— Removal, Reduction, Hauling, and Separating — Mixed Debris —Widespread or <br /> City-wide <br /> Ceres Headquarters Office Location: Sarasota, Florida permanent office with mobile Sunny Isles Beach <br /> office <br /> Number of TDSR Sites: 3 to 5 <br /> Location of TDSR Sites: To be determined <br /> Size of TDSR Sites: 5 to 20 acres <br /> Type of Hauling Equipment: Self loading knuckleboom trucks, dump trucks/trailers <br /> Total Expected Cubic Yards of Debris: up to 775,000 CY <br /> Quantity of Hauling Equipment: Self loading knuckleboom trucks, dump trucks/trailers, approximately 12 <br /> crews with approximately 63 trucks <br /> Time elapsed from Notice to Proceed to first arrival onsite of equipment: 1 hour <br /> Time elapsed from Notice to Proceed to complete mobilization: 50% in 24 hours, 100% in 48 hours <br /> Expected Management and Supervision Staff: General Management: 1 project manager, 1 site <br /> superintendent(s), 1 project superintendent, 3 zone managers, 5 foremen, 1 administrator, 1 accountant, 1 <br /> quality control officer, 1 clerk, 1 subcontracting officer, 1 safety and health officer, 1 public relations officer; <br /> plus Expected Personnel per TDSR Site: 1 TDSR Site Manager, 1 foreman with truck and cell phone, 1 <br /> assistant foreman, 5 to 8 heavy equipment operators, 2 to 4 flaggers for traffic control, 1 to 5 additional <br /> laborers for segregation and other material handling <br /> • <br /> Tab 8 Project Understanding and Technical Approach <br /> IENVIRONMENTAL Section 1 Debris Management Operations Plan <br /> Page 8-22 <br />