• <br /> City of Sunny Isles Beach <br /> • <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> assistant foreman, 5 to 8 heavy equipment operators, 2 to 4 flaggers for traffic control, 1 to 5 additional <br /> laborers for segregation and other material handling40 <br /> Methodology for Scheduling and Routing the Removal of Debris: Ceres would provide crews <br /> consisting of trucks, loaders, chain saw operators, and flaggers. Trucks and loading equipment would be <br /> provided with each crew, including self-loading knuckleboom trucks and other loading and hauling <br /> equipment. Bobcat type loaders would <br /> City of Baton Rouge/Parish of East Baton likely be used to forward material into <br /> Rouge, LA larger piles for efficient pickup by self <br /> 1,956,0SSCYHauled loading knuckleboom trucks. Each <br /> 108 Days crew would be supervised by a lead <br /> 100.004.00 •.....,,..,,..,. ...:- -...�....... ..:,,.._.<.. ..y..:m........K.....,._�v.. <br /> 90.000.00 f_ _ man, and each crew would be <br /> so.000.0D1: - <br /> - supervised by a foreman who would <br /> 70.000.00 ._ -_.._._ report to the Ceres superintendent <br /> 60.000.0* 1- --- •""" who would interface with the City field <br /> '0'000'0' r — representative. A Ceres site manager <br /> 40.000.00 _____ — <br /> 3000000 _- will be installed who will manage the <br /> ao,000.00TDSR site operations, which would <br /> likely include a tub grinder or air curtain <br /> 9/7/2003 loni2oosllnnoos 0/7/200.3incinerator, a dozer, an excavator with <br /> grapple and dump trucks to load out. A <br /> Ceres project manager would supervise the superintendent and DMS site manager, and will supervise site <br /> restoration. The Ceres project manager will also interface with the City administrators to assist with FEMA <br /> reimbursement including writing the Project Worksheet. Ceres' expert FEMA reimbursement staff would be <br /> available to assist further with FEMA reimbursement issues. <br /> The project manager together with the project superintendent would interface daily with City representatives <br /> to review the previous day's progress and would assign streets and geographic territories to crews based <br /> on previous progress and input from City representatives. <br /> 0 <br /> Administration: All trucks would be placarded and certified by Ceres and City personnel, and each load <br /> would.be ticketed by a City-authorized monitor. All loads will pass under an inspection tower and will be <br /> "scaled" or"called" by a City-authorized monitor and the load call will be recorded on the load ticket. Ceres <br /> will use its proprietary load ticket software that has been successfully used•for twelve years on FEMA- <br /> reimbursed projects. <br /> Daily reports will be issued by Ceres stating the amounts of debris hauled, the types of debris, and the <br /> zones from which the debris originated. Additional information will be provided by Ceres as requested by <br /> the City. Ceres, with the City's prior approval, will make available updates to citizens through internet <br /> access, including information on which areas have been cleared, and the proposed schedule for future <br /> clearing of debris. <br /> Event Type: 6 <br /> Catastrophic Event—Site Management—City-wide <br /> Ceres Headquarters Office Location: Sarasota, Florida permanent office with mobile Sunny Isles Beach <br /> office <br /> Number of TDSR Sites: 4 to 6 <br /> Location of TDSR Sites: To be determined <br /> Size of TDSR Sites: 5 to 20+ acres (possible site layout illustrated below) ' <br /> Total expected cubic yards of debris to process and document: 1,304,369 (see table above) <br /> Time elapsed from Notice to Proceed to first arrival onsite of equipment: 1 hour <br /> Time elapsed from Notice to Proceed to complete mobilization: 25% in 24 hours, 50% in 48 hours, <br /> 75% in 72 hours, 100% in 96 hours <br /> C EE o s,„,_, NTAL Tab 8 Project Understanding and Technical Approach <br /> E Section 1 Debris Management Operations Plan <br /> NVIRPage 8-24 <br />