City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> ® Expected Management and Supervision Staff: General Management personnel: 1 project manager, 1 <br /> assistant project manager, 1 project -� <br /> superintendent, 1 assistant project 4 <br /> superintendent, 1 FEMA/City liaison, 1. s4......._. f -- <br /> oP V—V IQI I <br /> quality control officer, 1 administrator can <br /> with 1 clerk, 1 subcontracting officer, 1 Rif'kDlgaxl Tower <br /> safety and health officer, 1 accountant ` , Debris Pile with <br /> with 2 clerks and data entry personnel w, ,PM.b I.Fe„"ans adequate room <br /> as required; Expected personnel per \ omcek for turnaround <br /> TDSR Site: 1 TDSR Site Manager, 1 f \' <br /> foreman with truck and cell phone, 1 ®� } <br /> assistant foreman, 7 or 8 heavy y'O° n'snu ' <br /> equipment operators, 2 to 4 flaggers for -- $2s-3o' --a. <br /> traffic control, 3 to 5 additional laborers <br /> for segregation and other material <br /> handling 11W - ti <br /> Ih <br /> Vegetdier brix /� �'' 3 <br /> Quantity of equipment per site: 1 utyG'inder `; <br /> grinder, 2 excavators and/or backhoes It�� , <br /> with grapples, 1 dozer, 1 wheel loader Axh11t 1 1 C i <br /> with rake, 1 wheel loader with bucket, 1 ( Mrc >dn�,�,K,,�S <br /> 15'–20' <br /> %.„ 300'>:sdua,m/ <br /> maintenance truck, 1 water truck for fire '_`";-' <br /> suppression, 1 to 2 inspection towers, 1 <br /> hazardous materials containment area. <br /> Methodology for accepting and measuring of debris: Inspection — From the constructed tower, the <br /> City's designated monitor will determine the capacity of the truck and estimated load volume (percent <br /> capacity), and evaluate the load for contaminants requiring segregation. The monitor will instruct the driver <br /> 411 regarding the appropriate dump location at the site and will verify the truck is completely empty following <br /> dumping. The monitor will complete the load ticket presented for each load delivered to the site. <br /> Unloading -After inspection, the material will be forwarded to the tipping area supported by a wheel loader <br /> with rake and laborers. The laborers will inspect the debris and remove any contaminants. Contaminants <br /> that are hazardous will be handled by the hazardous toxic waste specialist, staged in the hazmat <br /> containment area, and disposed of in accordance with federal, state, and local requirements. Other <br /> contaminants, such as metal, will be segregated accordingly. <br /> Segregation -While vegetative debris is generally the most voluminous debris stream, due to the nature of <br /> the storm, material segregation is frequently required in order to properly and efficiently process the debris. <br /> Collection crews will segregate grindable (vegetative) debris from non-grindable debris to the maximum <br /> extent possible during collection and loading operations. These loads, which may contain debris ranging <br /> from white goods, household hazardous waste (HHW), e-waste, and other materials, will be segregated <br /> and sorted either manually or mechanically to remove the contaminants and then moved to the <br /> appropriately lined/fenced areas at the DMS. <br /> Reduction-A wheel loader with rake will push material to the excavators and backhoes for loading material <br /> into the grinder. If the mulch produced from grinding is to remain on site for more than four weeks, the <br /> mulch piles will then be stacked no higher than 12 feet to minimize the potential for spontaneous <br /> combustion. Grinders will operate a safe distance from all other areas of the site to eliminate risk of injury <br /> from projectile debris from the grinder. The Dust Control plan will be implemented to ensure dust from the <br /> grinder does not impact the adjacent properties. All equipment in the vicinity of the grinders will be equipped <br /> with fully-enclosed cabs. If burning is allowed, the debris, once piled in the vicinity of the burn pit area, will <br /> be fed into the Air Curtain Incinerator in such a manner as to promote complete combustion. The backhoe <br /> will also set aside for forwarding any material that would process more efficiently in a chipper/grinder, such <br /> as large diameter logs or stumps. The Air Curtain will be operated at least 100 feet from any stockpile of <br /> debris and at least 1,000 feet from any occupied structure. <br /> "1 Final Disposal—Once debris measurement and processing operations are complete, the segregates non- <br /> grindables will be recycled to the maximum extent possible. Metals and concrete will be baled, crushed, or <br /> C EEoNVIRN,AL Tab 8 Project Understanding and Technical Approach <br /> J E Section 1 Debris Management Operations Plan <br /> Page 8-25 <br />