<br />CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
<br />Timothy Hall, P.E.
<br /> PROJECT ROLE | Project Manager
<br />City of Fort Lauderdale - General Engineering Services Contract
<br />Project Coordinator and point of contact for engineering, landscape, survey, and architectural services
<br />provided to the City through open-ended contract. In addition to management of multiple projects,
<br />responsible for overseeing design, commitment to schedule and meeting budgets for multi-facetted
<br />improvement projects. Projects include programs to provide water and wastewater improvements to
<br />existing neighborhoods served by septic systems and without adequate fire protection. Areas served
<br />include a mixture of single family, multi-family, commercial, office and industrial uses. In addition to
<br />utilities, improvements included streetscape, landscape, drainage, roadway re-alignment and traffic
<br />calming.
<br />Broward County Neighborhood Improvement Projects, Broward County - Four individual neighborhood
<br />improvement projects ranging from 900 to 1600 acres each. Prepare models to identify areas of
<br />inadequate fire protection, sewer collection, and drainage. Utilize models to design upgrades to water,
<br />force main, lift stations, and drainage. Improvements include re-grading of roadways and landscaping.
<br />Traffic Calming at the Intersections of 123rd Street & NW 1st Court, 123rd Street & Miami Court, NW 139th
<br />Terrace & NW 5th Court | North Miami, Florida | Project Lead - The project involved the development of
<br />designs for traffic calming features along NW 123th Street and NW 1st Court, NW 123rd Street and NW
<br />Miami Court, and 139th Street NW 5th Court in the City of North Miami. These intersections had large of
<br />expanses of pavement without traffic control and therefore required the impleme ntation of traffic calming
<br />features. CTA design elevated intersections, removed pavement and introduced curbing to reduce
<br />speeds.
<br />Government Center Commercial Alleyways 2” Watermain Replacement | North Miami Beach, Florida |
<br />Project Manager - As with many eastern Miami-Dade municipalities, North Miami Beach has an aging and
<br />undersized water distribution system. The City has embarked on a program to install & upgrade new
<br />watermain at various locations within their services area. The City hired Craven Thompson & Associates, Inc.
<br />to survey, design, permit and provide construction engineering and inspection services for the upgraded
<br />Government Center system including: 4,830 linear feet of 4” dia. main, 67 water services, and 12 gate valves
<br />along with 2,800 SY of pavement restoration.
<br />Honey Hill Water System Betterment | North Miami Beach, Florida | Project Manager - As with many
<br />eastern Miami-Dade municipalities, North Miami Beach has an aging and undersized water distribution
<br />system. The City has embarked on a program to install & Upgrade new watermain at various locations within
<br />their services area. The City hired Craven Thompson & Associates, Inc. to survey, design, permit and provide
<br />construction engineering and inspection services for the upgraded Government Center system including:
<br />4,830 LF of 4” dia. main, 67 water services, and 12 gate valves along with 2,800 SY of pavement restoration
<br />
<br />City of Fort Lauderdale - WW2011 Program, Fort Lauderdale, Florida
<br />Project Lead for design services related to City’s Capital Improvements Program which included
<br />approximately $636 million in utilities infrastructure repair, replacement, and upgrades. The program
<br />includes analysis, modeling and design for improvements to water and wastewater facilities in meeting a
<br />comprehensive plan in response to expanded demand and service areas.
<br />Port Everglades Utilities Analysis, Broward County, Florida
<br />Collect data and create model for use in analyzing network of public lift -stations and force mains. Model
<br />utilized for analysis of existing capacities as well as adaptability of individual lift stations and force mains
<br />for future expansion. Compiled list of alternatives for remediation of inadequate service levels and
<br />proposed recommendations for short term and long-term solutions based upon performance, cost, and
<br />constructability.
<br />F | Page 12
|