My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
104 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION UfApplicable) <br />Bal Harbour Force Main Replacement <br />Bal Harbour, Florida <br />2010 2011 <br />tl :i <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Designer: Planning, design, permitting, preparation of construction plans, <br />bidding and construction management of 12,000 linear feet of 16" force main trunk line <br />to service the entire Village to pump all raw sewage to Miami Beach. Services included <br />survey, utility locates, design, permitting, cost estimates, bidding, construction <br />management, community outreach and survey as-builts. Project cost $842,570 <br />1) TITLE AND LOCATION (City and State) <br />Capital Improvements Project - Phase III-IV <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (IfApplicab/e) <br />Golden Beach, Florida <br />2010 2011 <br />e <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Designer: Construction of submersible stormwater master pump station and <br />approximately 14,500 linear feet of drainage pipe and force main. Project cost <br />$7,667,276 <br />1) TITLE ANDLOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (fApplicable) <br />Palm & Hibiscus Islands Stormwater & Roadway <br />Improvements <br />2014 Ongoing <br />f <br />Miami Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Design engineering for a capital improvement project on Hibiscus Island including <br />drainage system, buried utilities, roadway design and harmonization to existing <br />residences. Construction costs total $3.7 million. <br />104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.