My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Greg Giarratana <br />15. FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S. Civil/Environmental Engineering, <br />1977, Rogers Williams University, Bristol, <br />Rhode Island <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />ASCE, WPCF and AWWA <br />19, RELEVANT PROJECTS <br />105 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />ONS RU TION (If <br />CONSTRUCTION <br />Applioore <br />oore Haven Water System Improvements <br />2008 <br />On-going <br />Haven, Florida <br />a <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager: Planning, design, computer modeling, permitting and construction <br />management of this $3.5M project. System includes 4,300 feet of 12", 200 feet of 10", <br />00 feet of 8" and 6" water mains including 4 HDPE directional bores, a booster pump <br />tation and an ultra filtration water treatment plant addition. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />iccosukee Water Distribution System <br />mprovements <br />2007 <br />On-going <br />b <br />iami, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />roject Manager: Design, computer modeling of existing raw water well piping and <br />ater distribution system including 6 miles of 12" water mains, a water treatment plant <br />nd new high service pump station. Estimated construction cost is $10,000,000. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />aim Beach County Lake Region Pipeline <br />aim Beach, Florida <br />2005 <br />2006 <br />c <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />roject Manager: Design plans and contract documents, hydraulic modeling and <br />ermitting for a 20 mile lake regional potable water pipeline. Project consisted of <br />esigning approximately 91,200 feet of water distribution main to serve the cities of <br />ahokee, Belle Glade and South Bay from the central lake region water treatment plant <br />ocated on Hooker Highway in Belle Glade. Design included raw water piping from 7 <br />otable water wells to the county reverse osmosis water treatment plant. Raw water <br />ains ranged from 12" diameter at each well to 30" diameter entering the water <br />treatment plant. The water treatment plant discharge pipe line consisted of 30" <br />iameter down to 1" diameter mains when tied into the cities of Pahokee and South <br />ay. The total pipeline construction cost was approximately $10,000,000. <br />105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.