Laserfiche WebLink
106 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION tMApplicable) <br />ardee County Bowling Green Water Line <br />eplacement <br />2004 2005 <br />d <br />oore Haven, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />roject Manager: Design, hydraulic modeling, surveying, bidding, construction <br />anagement of this $500,000 pipeline project consisting of 4,000 feet of 8" diameter <br />ater mains. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR iCOMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (lfApplicable) <br />TO Water Main Extension <br />Nest Palm Beach <br />2003 2004 <br />e <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />roject Manager: Design, hydraulic modeling, permitting, and construction <br />anagement of a $1.5M nine mile long, 12" diameter water main to extend West Palm <br />each utilities water service to western Indian Trial Improvement District. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (lfApplicable) <br />andolah Road Sewer Service Area <br />oore Haven, Florida <br />2001 2002 <br />f ; <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />roject Manager: Design, hydraulic modeling, permitting, surveying and construction <br />anagement of this $1.33M project consisting of 7.5 miles of force mains, 6 lift stations, <br />re-treatment master pump station, a regional wastewater treatment plant, and onsite <br />pray irrigation reuse disposal system. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (WApplicable) <br />auchula Hills Service Area Water Main &Force <br />ain <br />2001 2002 <br />s <br />auchula, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />roject Manager: Design, hydraulic modeling, permitting, surveying and construction <br />anagement for this $3.5M pipeline project consisting of 16,200 feet of 12" HDPE water <br />ains, 7,250 feet of 10" force main, 1,630 feet of 8" force main. Project consisted of a <br />otable water booster pump station, 400,000 gallon ground storage tank, 120,000 GPD <br />ackage wastewater treatment plant, effluent reuse pump station and 8" diameter reuse <br />ipeline. <br />106 <br />