Laserfiche WebLink
Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />REFERENCES <br />TOWN OF GOLDEN BEACH <br />1 Golden Beach Drive <br />Golden Beach, Florida 33160 <br />Contact: Alexander Diaz, Town Manager <br />Telephone: (305) 932-0744 <br />E-mail: alexdiaz@townofeoldenbeach.us <br />Status of Contract: Active <br />Contract No.: Professional Services Date Executed: 10/17/2000 <br />Work Performed: <br />CAS is the Consulting Engineers for the Town of Golden Beach and have worked with them since <br />October 17, 2000. This is a multi-year professional engineering services contract on a work order <br />basis. CAS has provided engineering services for the Town's water distribution system <br />rehabilitation and stormwater improvements. <br />Projects Completed: <br />Town Water Distribution Improvements consisted of the installation of approximately 1,215 linear <br />feet of 12 -inch water main, 13,850 linear feet of 8 -inch water main and 1,050 linear feet of 6 -inch <br />water main, 37 fire hydrant assemblies, and the transfer of 370 new water meters for a complete <br />retrofit of the Town's water main infrastructure. This project was funded through FDEP's State <br />Revolving Fund Program. Total design cost including construction management for the project <br />was $317,441. Total construction cost was $2,200,000. The project began in May 2009 and was <br />completed in November 2011 without liquidated damages. The project began in May 2009 and <br />was completed in November 2011 without liquidated damages. Key personnel included: Stephen <br />C. Smith, P.E., Robert D. Keener, P.S.M., James Driscoll, Al Caruso, E.I. and Tony Gomes. <br />Town Stormwater Improvements Phases III and IV were designed and constructed to be <br />consistent with the town's overall master plan. The project consisted of a stormwater master <br />pumping station with submersible pumps, 14,500 linear feet of DIP drainage pipe and force main <br />(ranging in size from 16" to 72"), 205 drainage structures and 7 outfalls. Design costs for the <br />project were $1,263,240. Total construction costs were $7,667,276. The project duration was <br />three years and was completed in March 2011 without liquidated damages. Key personnel <br />included: Stephen C. Smith, P.E., Orlando A. Rubio, P.E., William H. Landis, P.E., Al Caruso, E.I., <br />Robert D. Keener, P.S.M., James Driscoll, Tony Gomes and William Tanto. <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 <br />IBM <br />