Laserfiche WebLink
@ZA <br />Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />CITY OF SWEETWATER <br />500 SW 109th Avenue <br />Sweetwater, Florida 33174 <br />Contact: Eric Gomez, City Engineer <br />Telephone: (305) 553-5457 <br />E-mail: egomez.egsc@att.net <br />Status of Contract: Active <br />Contract No.: Res. #3480 Date Executed: 05/13/2010 <br />Work Performed: <br />CAS is the Consulting Engineer for the City of Sweetwater and has worked with them since <br />December 4, 2000. CAS has provided engineering for services for city-wide stormwater/drainage <br />improvements to alleviate historic flooding within the City. <br />Projects Completed: <br />Projects that CAS has completed for the City of Sweetwater in the past included Phase I & III <br />Stormwater Improvements within a 225 acre area which consisted of 115 structures, 7,400 linear <br />feet of drainage pipe ranging in size from 15 -inch to 72 -inch, 7,325 linear feet of force main <br />ranging in size from 24 -inch to 48 -inch, four (4) duplex pump stations, roadway restoration and <br />the complete reconstruction of 2,500 linear feet of NW 112th Avenue. Scope of services included <br />survey, utility locates, FEMA grant applications, planning, design, cost estimates, preparation of <br />construction plans and contract documents, permitting, bidding, construction management and <br />full-time resident construction observation services, survey as-builts and certification through <br />project closeout. The project began in February 2000 and was completed In December 2004 <br />within the accepted schedules and no liquidated damages. Design Cost (including Construction <br />Management): $1,483,440. Construction Cost: $7,058,530. Key personnel included: Stephen C. <br />Smith, P.E., Robert D. Keener, P.S.M., Orlando A. Rubio, P.E., Al Caruso, E.I., James Driscoll and <br />Tony Gomes. <br />Phase IV Stormwater Improvements within a 138 -acre residential area consisted of 130 <br />structures, 10,795 linear feet of drainage pipe ranging in size from 15 -inch to 72 -inch, 1,506 <br />linear feet of 30 -inch force main and two (2) triplex pumping stations (28 HP). Scope of services <br />included surveying, utility locating, FEMA grant applications, planning, design, cost estimates, <br />preparation of construction plans and contract documents, permitting, bidding, construction <br />management and limited engineering services during construction. The $4.09M project began In <br />May 2011 and was completed in August 2013 with no liquidated damages. The project received <br />substantial HMGP funding from FEMA with CAS' grant writing assistance. Key personnel included: <br />Stephen C. Smith, P.E., Robert D. Keener, P.S.M., Orlando A. Rubio, P.E., Al Caruso, E.I., James <br />Driscoll and Tony Gomes. <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 <br />163 <br />