My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br />QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each pMoct.) <br />21. TITLE AND LOCATION /City and Statel 22. YEAR COMPLETED <br />Sweetwater Stormwater Improvements Phase 4 PROFESSIONAL SERVICES CONSTRUCTION (Yapplicab/e) <br />Sweetwater, Florida 2010 1 2012 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Sweetwater Allan Abolila 786-606-3726 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and wsU <br />The City of Sweetwater experiences regular flooding due to stoml water. This project is one of several that improved the <br />ability to capture and efficiently transport storm water from the streets of the community to the major drainage canals using <br />new catch basins, piping and lift stations. <br />Bailey Engineering provided the electrical and control system design for the stormwater system for the City. A new 200 <br />amp 480 service and emergency generator was provided. <br />Services Provided: <br />• Power Systems <br />• Instrumentation and Control Systems <br />• Emergency Power Systems <br />Estimated Cost: <br />• $6.5 Million <br />Completion Date <br />2014 <br />Owner: <br />City of Sweetwater <br />500 SW 109th Avenue <br />Sweetwater, FL 33174 <br />(305)553-5457 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (Co and State) (3) ROLE <br />a, Bailey Engineering Consultants, Cooper City, FL Electrical & Instrumentation Engineering <br />Inc. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br />79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.