My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br />QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not apeciFed. 2 <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (Cky and Slate) 22. YEAR COMPLETED <br />Broward County Lift Stations 50N & 50M) PROFESSIONAL SERVICES CONSTRUCTION Inawficable) <br />Broward County, FL Ongoing TBD <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Broward County I Francisco Reins 954-831-3250 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and eeat) <br />Bailey Engineering Consultants, Inc. was contracted to provide electrical design for the referenced project. Our scope of <br />work included the following: <br />I. Electrical, instrumentation and control design associated with the replacement of two (2) lift stations. Each lift station <br />is a duplex pump station with across the line starters for each pump. Sizes for each proposed pump assumed to be less <br />than 25 -horsepower. All electrical distribution equipment was installed outdoors. <br />2. Our services also included the design of the Pump Control Panel (PCP) designed in accordance with Broward County <br />standards. <br />3. A Broward County standard Remote Telemetry Unit (RTU) was provided as part of our design. <br />4. Electrical design associated with providing a portable standby generator for each lift station. <br />5. Coordination with the Florida Power & Light (FPL) as required to establish electrical service for the proposed facilities. <br />Services Provided: <br />• Electrical Engineering <br />• Instrumentation Engineering <br />• Client Interface <br />• Multi -discipline Coordination <br />Estimated Cost: <br />$90K <br />Completion Date: <br />2018 <br />TBD <br />Owner: <br />Broward County <br />Francisco Reina <br />Water & Wastewater Dept <br />2555 West Copans Road Pompano Beach, FL 33069 <br />(954)831-3250 <br />Existing Control Panel <br />& RTU <br />Existing FPL Pole Mounted <br />Transformers <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City State) (3) ROLE <br />a, Bailey Engineering Consultants, Cooper City, FL Electrical & Instrumentation Engineering <br />Inc. <br />STANDARD FORM 330 (REV. 8/2016) PAGES <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.