My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br />QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, it not specified. <br />Complete one Section F for each project.) 3 <br />21. TITLE AND LOCATION (CNyand State) 22. YEAR COMPLETED <br />CSU Wastewater Treatment Plant PROFESSIONAL SERVICES CONSTRUCTION(//app/kable) <br />The Villages, Florida 2010 2012 <br />23. PROJECT OWNERS INFORMATION <br />a. PROJECT OWNER G. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />The Villages Trey Arnett 352-753-4747 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Induce scope, size, and cost) <br />Bailey Engineering Consultants, Inc. (BEC) provided design and construction management services for this $13 -million <br />wastewater treatment facility. <br />This design -build project consisted of the design and construction of a 2.0 MGD wastewater plant. Construction included <br />two oxidation ditches, a mixed liquor splitter box, two 70' diameter clarifiers, headworks, RAS/WAS pump station, effluent <br />filters, chlorine contact basin, hypochlorite building, four sludge holding tanks, an emergency generator, an electrical <br />building, a sludge press building with belt press equipment, a plant recycle pump station and yard piping. Work also <br />included the re -design of a plant with 100 HP aerators for higher wastewater strength loadings, a 400,000 gallon surge tank <br />with Cover and odor control. <br />Services Provided: <br />• Electrical Engineering <br />• Client Interface <br />• Multi -discipline Coordination <br />Estimated Cost: <br />• $12 Million <br />Completion Date (Design): <br />2012 <br />Owner: <br />Mr. Trey Arnett <br />Central Sumter Utility Company, LLC <br />(352)753-4747 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />NAME I(2) FIRM LOCATION (City and State) I(3)ROLE <br />Engineering Consultants, Cooper City, FL Electrical Engineering <br />STANDARD FORM 330 (REV. W016) PAGE 6 <br />81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.