Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br />QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br />(Presentee many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for eachproject.)4 <br />21. TITLE AND LOCATION (QYy and State) 22. YEAR COMPLETED <br />Oakland Shores Water System Improvements PROFESSIONAL SERVICES CONSTRUCTION (MapplicaMe) <br />2014 2014 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Town of Oakland Mike Parker (407) 656-1117 <br />24, BRIEF <br />AND RELEVANCE TO THIS CONTRACT (Indude scope, We, aril cost) <br />Bailey Engineering Consultants (BEC) provided the electrical and control system design for the water system improvements <br />for the Town of Oakland. The improvements included a ground storage tank, high service pumps, and an <br />operations/electrical building. <br />EFI provided a tum key high service pump building. BEC interfaced the new high service pump controls with the Town's 2 <br />existing wells via an existing radio communications system. <br />Services Provided: <br />• Power Systems <br />• Instrumentation and Control Systems <br />Estimated Cost: <br />• $2.2 Million <br />Completion Date <br />2014 <br />Owner: <br />Town of Oakland <br />Mike Parker <br />(407) 656-1117 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />NAME <br />Engineering Consultants, <br />FIRMLOCATION (Cityand State) (3)ROLE <br />roper City, FL I Electrical & Instrumentation <br />STANDARD FORM 330 (REV. 8/2016) PAGE 7 <br />a <br />